Page:United States Statutes at Large Volume 102 Part 4.djvu/1070

From Wikisource
Jump to navigation Jump to search
This page needs to be proofread.

PUBLIC LAW 100-000—MMMM. DD, 1988

102 STAT. 4040

PUBLIC LAW 100-676—NOV. 17, 1988 (b) LIMITS ON APPLICABILTTY; REGULATORY REQUIREMENTS.—The

declaration under subsection (a) shall apply only to those parts of the areas described in subsection (a) of this section which are or will be bulkheaded and filled or otherwise occupied by permanent structures, including marina facilities. All such work is subject to all applicable Federal statutes and regulations, including, but not necessarily limited to, sections 9 and 10 of the Act of March 3, 1899 (30 Stat. 1151; 33 U.S.C. 401 and 403), commonly known as the River and Harbors Appropriation Act of 1899, section 404 of the Federal Water Pollution Control Act, and the National Environmental Policy Act of 1969. (c) EXPIRATION DATE.—If, 20 years from the date of the enactment of this Act, any area or part thereof described in subsection (a) of this section is not bulkheaded or filled or occupied by permanent structures, including marina facilities, in accordance with the requirements set out in subsection O> of this section, or if work in t) connection with any activity permitted in subsection (b) is not commenced within 5 years after issuance of such permits, then the declaration of non-navigability for such area or part thereof shall expire. SEC. 40. EXTENSION OF MODIFIED WATER DELIVERY SCHEDULES, EVERGLADES NATIONAL PARK.

The first sentence of section 1302 of the Supplemental Appropriations Act, 1984 (97 Stat. 1292-1293) is amended by striking out "January 1, 1989" and inserting in lieu thereof "January 1, 1992". SEC. 41. PERIOD OF ENVIRONMENTAL DEMONSTRATION PROGRAM. (a) EXTENSION OF PERIOD.—Section 1135(b) of the Water Resources

Development Act of 1986 (33 U.S.C. 2294 note) is amended by striking out "two-year period" and inserting in lieu thereof "5-year period. (b) REPORTS.—Section 1135(d) of such Act is amended by striking out "two years" and inserting in lieu thereof "5 years". Energy. 42 USC 1962d-5g note.

Energy. 42 USC 1962d-5g note.

SEC. 42. FEDERAL HYDROELECTRIC POWER MODERNIZATION STUDY.

(a) STUDY.—The Secretary shall conduct a study of the need to modernize and upgrade the federally owned and operated hydroelectric power system. 0>) RQ>ORT.—Not later than 2 years after the date of the enact* ment of this section, the Secretary shall transmit to Congress a report on the results of the study conducted under subsection (a) together with recommendations. SEC. 43. WATER QUALITY EFFECTS OF HYDROELECTRIC FACILITIES.

(a) STUDY.—The Secretary, in cooperation with the Administrator of the Environmental Protection Agency, shall undertake a study of the water quality effects of hydroelectric facilities owned and operated by the Corps of Engineers. Such study shall be transmitted to Congress within 2 years of the date of the enactment of this Act and shall consider and include information for each such Corps of Engineers hydroelectric facility pertaining to: relevant water quality stcmdards including dissolved oxygen; water quality monitoring data; possible options and projected costs of measures required to improve the quality of water released from each such facility where justified; and recommendations with respect to such study results.