Page:United States Statutes at Large Volume 110 Part 5.djvu/216

From Wikisource
Jump to navigation Jump to search
This page needs to be proofread.

110 STAT. 3290 PUBLIC LAW 104-266—OCT. 9, 1996 Public Law 104-266 104th Congress Oct. 9, 1996 [H.R. 3660] Reclamation Recycling and Water Conservation Act of 1996. 43 USC 390h note. 43 USC 390h-13, 390h-14, 390h-15. 43 USC 390h-12a. 43 USC 390h-12b. An Act To make amendments to the Reclamation Wastewater and Groundwater Study and Facilities Act, and for other purposes. Be it enacted by the Senate and House of Representatives of the United States of America in Congress assembled, SECTION 1. SHORT TITLE. This Act may be cited as the "Reclamation Recycling and Water Conservation Act of 1996". SEC. 2. WATER RECYCLING PROJECTS. (a) IN GENERAL.— The Reclamation Projects Authorization and Adjustment Act of 1992 (43 U.S.C. 390h et seq.) is amended— (1) by redesignating sections 1615, 1616, and 1617 as sections 1631, 1632, and 1633, respectively, and (2) by inserting after section 1614 the following new sections: "SEC. 1616. NORTH SAN DIEGO COUNTY AREA WATER RECYCLING PROJECT. "(a) AUTHORIZATION.—The Secretary, in cooperation with the appropriate State and local authorities, is authorized to participate in the design, planning, and construction of the North San Diego County Area Water Recycling Project, consisting of projects to reclaim and reuse water within service areas of the San Elijo Joint Powers Authority, the Leucadia County Water District, the City of Carlsbad, and the OUvenhain Municipal Water District, California. "(b) COST SHARE. — The Federal share of the cost of a project described in subsection (a) shall not exceed 25 percent of the total cost. "(c) LIMITATION. —The Secretary shall not provide funds for the operation or maintenance of a project described in subsection (a). "SEC. 1616. CALLEGUAS MUNICIPAL WATER DISTRICT RECYCLING PROJECT. "(a) AUTHORIZATION.—The Secretary, in cooperation with the appropriate State and local authorities, is authorized to participate in the design, planning, and construction of the Calleguas Municipal Water District Recycling Project to reclaim and reuse water in the service area of the Calleguas Municipal Water District in Ventura County, California. "(b) COST SHARE. — The Federal share of the cost of a project described in subsection (a) shall not exceed 25 percent of the total cost.