Page:United States Statutes at Large Volume 110 Part 5.djvu/589

From Wikisource
Jump to navigation Jump to search
This page needs to be proofread.

PUBLIC LAW 104-303 —OCT. 12, 1996 110 STAT. 3663 (i) all operation, maintenance, repair, replacement, and rehabilitation costs associated with the improvements carried out under this paragraph; and (ii) 25 percent of the costs incurred for the variable flood control operation of the Folsom Dam and Reservoir during the 4-year period beginning on the date of the enactment of this Act and 100 percent of such costs thereafter. (2) HUMBOLDT HARBOR AND BAY, CALIFORNIA. —The project for navigation, Humboldt Harbor and Bay, California: Report of the Chief of Engineers, dated October 30, 1995, at a total cost of $15,180,000, with an estimated Federal cost of $10,000,000 and an estimated non-Federal cost of $5,180,000. (3) MARIN COUNTY SHORELINE, SAN RAFAEL, CALIFORNIA. — The project for hurricane and storm damage reduction, Marin County shoreline, San Rafael, California: Report of the Chief of Engineers, dated January 28, 1994, at a total cost of $28,300,000, with an estimated Federal cost of $18,400,000 and an estimated non-Federal cost of $9,900,000. (4) PORT OF LONG BEACH (DEEPENING), CALIFORNIA. —The project for navigation, Port of Long Beach (Deepening), California: Report of the Chief of Engineers, dated July 26, 1996, at a total cost of $37,288,000, with an estimated Federal cost of $14,318,000 and an estimated non-Federal cost of $22,970,000. (5) SAN LORENZO RIVER, CALIFORNIA. —The project for flood control, San Lorenzo River, California: Report of the Chief of Engineers, dated June 30, 1994, at a total cost of $21,800,000, with an estimated Federal cost of $10,900,000 and an estimated non-Federal cost of $10,900,000 and habitat restoration, at a total cost of $4,050,000, with an estimated Federal cost of $3,040,000 and an estimated non-Federal cost of $1,010,000. (6) SANTA BARBARA HARBOR, CALIFORNIA. —The project for navigation, Santa Barbara Harbor, California: Report of the Chief of Engineers, dated April 26, 1994, at a total cost of $5,840,000, with an estimated Federal cost of $4,670,000 and an estimated non-Federal cost of $1,170,000. (7) SANTA MONICA BREAKWATER, CALIFORNIA. —The project for hurricane and storm damage reduction, Santa Monica Breakwater, Santa Monica, California: Report of the Chief of Engineers, dated June 7, 1996, at a total cost of $6,440,000, with an estimated Federal cost of $4,220,000 and an estimated non-Federal cost of $2,220,000. (8) ANACOSTL^ RIVER AND TRIBUTARIES, DISTRICT OF COLUM- BIA AND MARYLAND. —The project for environmental restoration, Anacostia River and Tributaries, District of Columbia and Maryland: Report of the Chief of Engineers, dated November 15, 1994, at a total cost of $17,144,000, with an estimated Federal cost of $12,858,000 and an estimated non-Federal cost of $4,286,000. (9) ATLANTIC INTRACOASTAL WATERWAY, ST. JOHNS COUNTY, FLORIDA.— The project for navigation, Atlantic Intracoastal Waterway, St. Johns County, Florida: Report of the Chief of Engineers, dated June 24, 1994, at a total Federal cost of $15,881,000. Operation, maintenance, repair, replacement, and rehabilitation shall be a non-Federal responsibility, and the non-Federal interest shall assume ownership of the bridge.