119 STAT. 1320
PUBLIC LAW 109–59—AUG. 10, 2005 Highway Projects High Priority Projects—Continued
No. 1633
1634 1635 1636 1637 1638 1639 1640 1641 1642
1643 1644 1645 1646 1647 1648
1649 1650 1651 1652
1653 1654 1655 1656 1657
VerDate 14-DEC-2004
13:51 Oct 26, 2006
Jkt 039194
PO 00002
State
Project Description
CA
Conduct project report study on Old River School Rd—Firestone Blvd. intersection reconfiguration .................................................... Conduct study for Port of Miami Tunnel, Miami, FL ........................................................ Ithaca, Design and construct pedestrian and bicycle path (Cayuga Waterfront Trail) ......... Greenway Trails Project, Elizabeth City .......... Reconstruct Lakeshore Drive overpass over Lawrence Avenue ............................................ Replace Murphy Road West Bridge, Anderson, SC ..................................................................... Resurface and construct truck lane at CA Hwy 94 and I–8 interchange, Boulevard ................ Undertake road improvements associated with Coltsville Area Redevelopment, Hartford ...... Upgrade and Re-opening of Main Street in Yuma ................................................................ Pedestrian facilities, street lighting and streetscaping improvements in downtown Laurel Springs ................................................. Upgrade Blue Cane Road in Tallahatchie County, and roads in Webb and Tutwiler ..... Upgrade circuitry on vehicle protection device at Sheldon Road rail crossing in Berea ......... Design and construct Upper Delaware Scenic Byway Visitor Center, Cochecton ................... Construct sidewalks and curbing on Westchester Avenue in Village of Buchanan ........ Downtown Redevelopment Project, City of Rocky Mount .................................................... Construction of divided four lane concrete arterial with drainage improvements—Sandy Lake Road: Denton Tap Rd. to North Coppell Road .................................................... Preconstruction and Construction at IL 120 at Bacon Road and Cedar Lake Road ................ Revitalization project will extend and resurface the Roberta Walking Trail, Roberta ...... Construct Westbound Access to Mountain Parkway from Exit 18 (KY 1057), Powell County .............................................................. Development of 2 miles of road parallel to I–95 located approximately between the I–95/NC 125 interchange and I–95/U.S. 158 interchange .............................................................. Engineering, right-of-way and construction of HOV lanes on I–580 in the Livermore Valley, California .................................................. Construct Streetscape Project, City of Markham ................................................................... Landscape south side of the 91 Fwy at Bellflower Blvd. in Bellflower ............................... Southwick and Westfield Rail Trail, Design and Construction ............................................. Upgrade DOT crossing #467665M to constant warning time devices ......................................
FL NY NC IL SC CA CT AZ NJ
MS OH NY NY NC TX
IL GA KY NC
CA IL CA MA VA
Frm 00177
Fmt 6580
Sfmt 6581
E:\PUBLAW\PUBL002.119
Amount
APPS06
$400,000 $1,600,000 $960,000 $512,000 $1,200,000 $188,000 $2,400,000 $1,600,000 $960,000
$477,059 $600,000 $112,000 $600,000 $220,000 $5,068,800
$800,000 $1,092,000 $400,000
$2,320,000
$1,200,000 $9,600,000 $400,000 $200,000 $4,000,000 $155,680
PsN: PUBL002
�