Page:United States Statutes at Large Volume 119.djvu/1351

From Wikisource
Jump to navigation Jump to search
This page needs to be proofread.

[119 STAT. 1333]
PUBLIC LAW 109-000—MMMM. DD, 2005
[119 STAT. 1333]

PUBLIC LAW 109–59—AUG. 10, 2005

119 STAT. 1333

Highway Projects High Priority Projects—Continued

No. 1965 1966 1967 1968 1969 1970 1971

1972 1973

1974 1975 1976

1977 1978 1979 1980 1981 1982 1983 1984 1985 1986 1987

VerDate 14-DEC-2004

13:51 Oct 26, 2006

State

Project Description

NC

Construct Neuse River Trail in Johnston County .............................................................. Construct landscaping and other pedestrian amenities in segments of the Old Spanish Trail and Griggs Road rights-of-way ............. Construction of and improvements to Union Road and Walden Avenue in Cheektowaga .. Construction of West Covington Bypass-LA 21 Widening .......................................................... Construct Byrd Parkway Extension, Petal ....... Intermodal transportation improvements in Coney Island .................................................... Construct one mile of new roadway and a bridge crossing the DM&IR railroad tracks, and construct connector between CSAH 14 and CSAH 284, Proctor ................................... Construct Park and Ride, Exit 5 on I–93— Londonderry, NH ............................................ Design, engineering, ROW acquisition and construction of streetscaping enhancements, paving, lighting, safety improvements, parking and roadway redesign in Exeter Borough, Luzerne County ..................................... Extension of River Road in Reading, PA to provide access to major industrial and brownfields sites .............................................. Point MacKenzie in Matanuska-Susitna Borough plan and design road access .................. Repair 4.35 miles of Lake Ridge Parkway. Widen roadway along with 2 bridges from 4 lanes to 6 across Joe Poole Lake in Grand Prairie, TX ....................................................... Robert Taylor Homes CHA Street Construction, City of Chicago ........................................ Rockwood Town Center for Stark Street from 190th to 197th for pedestrian, bicycle and transit facilities and safety mitigation .......... Route 89 Curve Realignment one mile north of Titusville on Route 89 ..................................... Sand Lake Road Improvements between Presidents Drive and I–4 ........................................ Sault Ste. Marie, Reconstruct East Spruce Street with drainage, curb, gutter, pavement, traffic control devices ........................... Study and construct I–96/U.S. 31/Sternberg Road area improvements ................................ Provide access to HOV ramp from Reedsdale Street with traffic signals, pavement markings, lane control and fast acting gates ......... The extension of MacArthur Blvd. from Wabash to Iron Bridge Road. Springfield ........... Construct Cedar Creek Linear Park Trail, Quincy .............................................................. Conduct study for U.S. 50 Corridor Improvements, Dearborn County, Indiana ................. Design, land acquisition, and construct West State St. (US Business 20) from Meridan Rd. to Rockton Ave. in Rockford, IL ..............

TX NY LA MS NY MN

NH PA

PA AK TX

IL OR PA FL MI MI PA IL IL IN IL

Jkt 039194

PO 00002

Frm 00190

Fmt 6580

Sfmt 6581

Amount $1,600,000 $1,600,000 $800,000 $3,200,000 $1,200,000 $3,200,000

$2,624,000 $1,600,000

$160,000 $1,200,000 $1,000,000

$4,800,000 $440,000 $2,000,000 $240,000 $4,800,000 $760,000 $2,000,000 $1,600,000 $1,200,000 $400,000 $240,000 $1,600,000

E:\PUBLAW\PUBL002.119

APPS06

PsN: PUBL002