Page:United States Statutes at Large Volume 119.djvu/1513

From Wikisource
Jump to navigation Jump to search
This page needs to be proofread.

[119 STAT. 1495]
PUBLIC LAW 109-000—MMMM. DD, 2005
[119 STAT. 1495]

PUBLIC LAW 109–59—AUG. 10, 2005

119 STAT. 1495

Transportation Improvements—Continued

No. 178. 179.

180. 181. 182.

State

Project Description

MA

Design and construct downtown roadway and streetscape improvements in Brockton .................

$2,000,000

Design, engineering, and construction at I–93 The Junction Interchange, Andover, Tewksbury, and Wilmington ..............................................................

$4,000,000

Gainsborough St. and St. Botolph Street Improvements in Boston ......................................................

$2,000,000

Upgrade MD 175 in Anne Arundel County between MD 170 and BW Parkway .....................................

$5,000,000

Improve U.S. 40, MD 715 interchange at Aberdeen Proving Ground ......................................................

$5,000,000

MA

MA MD MD

Amount

183.

MD

Upgrade MD 4 at Suitland Parkway ........................

$5,000,000

184.

MD

Construct Fort McHenry Visitors Center and related parking facilities ...........................................

$2,000,000

Plan and construct North-South Aroostook highways to improve access to the St. John Valley, including Presque Isle Bypass and other improvements ..............................................................

$5,000,000

Repair and improvement of Deer Isle-Sedgwick Bridge ......................................................................

$3,000,000

Construction of Calais/St. Stephen Border Crossing Project ......................................................................

$1,000,000

185.

186. 187.

ME

ME ME

188.

ME

Replacement of Waldo-Hancock Bridge ....................

$1,000,000

189.

ME

Improvements and construction of U.S. Route 1A and State Route 9 in Bangor, Maine ....................

$1,500,000

Planning and construction of the Gorham Bypass, Gorham, Maine .......................................................

$2,500,000

Access and Traffic Improvements to Route 15 in Brewer, Maine ........................................................

$500,000

190. 191.

ME ME

192.

ME

Sedgewick—Deer Isle Bridge, Sedgewick, Maine ....

$3,000,000

193.

ME

Augusta Memorial Bridge improvements, Augusta, Maine .......................................................................

$1,000,000

Replacement of Waldo-Hancock and construction of related pedestrian walkways .................................

$1,000,000

Research development of Cathodic Bridge Protection to extend the life of concrete bridges and Marine structures within varied climates ............

$500,000

Detroit Riverfront Conservancy, West Riverfront Walkway, Greenway and Adjacent Land Acquisition, from Riverfront Towers to Ambassador Bridge, Detroit ........................................................

$20,000,000

194. 195.

196.

VerDate 14-DEC-2004

ME ME

MI

13:51 Oct 26, 2006

Jkt 039194

PO 00002

Frm 00352

Fmt 6580

Sfmt 6581

E:\PUBLAW\PUBL002.119

APPS06

PsN: PUBL002