Page:United States Statutes at Large Volume 119.djvu/985

From Wikisource
Jump to navigation Jump to search
This page needs to be proofread.

[119 STAT. 967]
PUBLIC LAW 109-000—MMMM. DD, 2005
[119 STAT. 967]

PUBLIC LAW 109–58—AUG. 8, 2005

119 STAT. 967

and each nonregulated electric utility, shall complete the consideration, and shall make the determination, referred to in section 111 with respect to the standard established by paragraph (14) of section 111(d).’’. (h) FAILURE TO COMPLY.—Section 112(c) of the Public Utility Regulatory Policies Act of 1978 (16 U.S.C. 2622(c)) is amended by adding at the end the following: ‘‘In the case of the standard established by paragraph (14) of section 111(d), the reference contained in this subsection to the date of enactment of this Act shall be deemed to be a reference to the date of enactment of such paragraph (14).’’. (i) PRIOR STATE ACTIONS REGARDING SMART METERING STANDARDS.— (1) IN GENERAL.—Section 112 of the Public Utility Regulatory Policies Act of 1978 (16 U.S.C. 2622) is amended by adding at the end the following: ‘‘(e) PRIOR STATE ACTIONS.—Subsections (b) and (c) of this section shall not apply to the standard established by paragraph (14) of section 111(d) in the case of any electric utility in a State if, before the enactment of this subsection— ‘‘(1) the State has implemented for such utility the standard concerned (or a comparable standard); ‘‘(2) the State regulatory authority for such State or relevant nonregulated electric utility has conducted a proceeding to consider implementation of the standard concerned (or a comparable standard) for such utility within the previous 3 years; or ‘‘(3) the State legislature has voted on the implementation of such standard (or a comparable standard) for such utility within the previous 3 years.’’. (2) CROSS REFERENCE.—Section 124 of such Act (16 U.S.C. 2634) is amended by adding the following at the end thereof: ‘‘In the case of the standard established by paragraph (14) of section 111(d), the reference contained in this subsection to the date of enactment of this Act shall be deemed to be a reference to the date of enactment of such paragraph (14).’’. SEC. 1253. COGENERATION AND SMALL POWER PRODUCTION PURCHASE AND SALE REQUIREMENTS.

(a) TERMINATION OF MANDATORY PURCHASE AND SALE REQUIREMENTS.—Section 210 of the Public Utility Regulatory Policies Act of 1978 (16 U.S.C. 824a–3) is amended by adding at the end the following: ‘‘(m) TERMINATION OF MANDATORY PURCHASE AND SALE REQUIREMENTS.— ‘‘(1) OBLIGATION TO PURCHASE.—After the date of enactment of this subsection, no electric utility shall be required to enter into a new contract or obligation to purchase electric energy from a qualifying cogeneration facility or a qualifying small power production facility under this section if the Commission finds that the qualifying cogeneration facility or qualifying small power production facility has nondiscriminatory access to— ‘‘(A)(i) independently administered, auction-based day ahead and real time wholesale markets for the sale of electric energy; and (ii) wholesale markets for long-term sales of capacity and electric energy; or

VerDate 14-DEC-2004

08:19 Oct 26, 2006

Jkt 039194

PO 00001

Frm 00965

Fmt 6580

Sfmt 6581

E:\PUBLAW\PUBL001.119

APPS06

PsN: PUBL001