Page:United States Statutes at Large Volume 121.djvu/1071

From Wikisource
Jump to navigation Jump to search
This page needs to be proofread.
[121 STAT. 1050]
PUBLIC LAW 110-000—MMMM. DD, 2007
[121 STAT. 1050]

121 STAT. 1050

PUBLIC LAW 110–114—NOV. 8, 2007

dkrause on GSDDPC44 with PUBLAW

(3) SANTA CRUZ RIVER, PASEO DE LAS IGLESIAS, ARIZONA.— The project for environmental restoration, Santa Cruz River, Pima County, Arizona: Report of the Chief of Engineers dated March 28, 2006, at a total cost of $97,700,000, with an estimated Federal cost of $63,300,000 and an estimated non-Federal cost of $34,400,000. (4) TANQUE VERDE CREEK, PIMA COUNTY, ARIZONA.—The project for environmental restoration, Tanque Verde Creek, Pima County, Arizona: Report of the Chief of Engineers dated July 22, 2003, at a total cost of $5,906,000, with an estimated Federal cost of $3,836,000 and an estimated non-Federal cost of $2,070,000. (5) SALT RIVER (RIO SALADO OESTE), MARICOPA COUNTY, ARIZONA.—The project for environmental restoration, Salt River (Rio Salado Oeste), Maricopa County, Arizona: Report of the Chief of Engineers dated December 19, 2006, at a total cost of $166,650,000, with an estimated Federal cost of $106,629,000 and an estimated non-Federal cost of $60,021,000. (6) SALT RIVER (VA SHLY’AY AKIMEL), MARICOPA COUNTY, ARIZONA.— (A) IN GENERAL.—The project for environmental restoration, Salt River (Va Shly’ay Akimel), Arizona: Report of the Chief of Engineers dated January 3, 2005, at a total cost of $162,100,000, with an estimated Federal cost of $105,200,000 and an estimated non-Federal cost of $56,900,000. (B) COORDINATION WITH FEDERAL RECLAMATION PROJECTS.—The Secretary, to the maximum extent practicable, shall coordinate the design and construction of the project described in subparagraph (A) with the Bureau of Reclamation and any operating agent for any Federal reclamation project in the Salt River Basin to avoid impacts to existing Federal reclamation facilities and operations in the Salt River Basin. (7) MAY BRANCH, FORT SMITH, ARKANSAS.—The project for flood damage reduction, May Branch, Fort Smith, Arkansas: Report of the Chief of Engineers dated December 19, 2006, at a total cost of $30,850,000, with an estimated Federal cost of $15,010,000 and an estimated non-Federal cost of $15,840,000. (8) HAMILTON CITY, GLENN COUNTY, CALIFORNIA.—The project for flood damage reduction and environmental restoration, Hamilton City, Glenn County, California: Report of the Chief of Engineers dated December 22, 2004, at a total cost of $52,400,000, with an estimated Federal cost of $34,100,000 and estimated non-Federal cost of $18,300,000. (9) SILVER STRAND SHORELINE, IMPERIAL BEACH, CALIFORNIA.—The project for storm damage reduction, Silver Strand Shoreline, Imperial Beach, California: Report of the Chief of Engineers dated December 30, 2003, at a total cost of $13,700,000, with an estimated Federal cost of $8,521,000 and an estimated non-Federal cost of $5,179,000, and at an estimated total cost of $42,500,000 for periodic beach nourishment over the 50-year life of the project, with an estimated Federal cost of $21,250,000 and an estimated non-Federal cost of $21,250,000.

VerDate Aug 31 2005

13:52 Jan 23, 2009

Jkt 059194

PO 00001

Frm 01048

Fmt 6580

Sfmt 6581

M:\STATUTES\2007\59194PT1.001

APPS10

PsN: 59194PT1