Page:United States Statutes at Large Volume 121.djvu/1170

From Wikisource
Jump to navigation Jump to search
This page needs to be proofread.
[121 STAT. 1149]
PUBLIC LAW 110-000—MMMM. DD, 2007
[121 STAT. 1149]

PUBLIC LAW 110–114—NOV. 8, 2007

121 STAT. 1149

‘‘(14) Weathersfield Reservoir, Springfield. ‘‘(15) Burr Pond, Sudbury. ‘‘(16) Maidstone Lake, Guildhall. ‘‘(17) Upper and Lower Hurricane Dam. ‘‘(18) Lake Fairlee. ‘‘(19) West Charleston Dam. ‘‘(20) White River, Sharon.’’. SEC. 3157. LAKE CHAMPLAIN EURASIAN MILFOIL, WATER CHESTNUT, AND OTHER NONNATIVE PLANT CONTROL, VERMONT.

Under authority of section 104 of the River and Harbor Act of 1958 (33 U.S.C. 610), the Secretary may revise the existing General Design Memorandum to permit the use of chemical means of control, when appropriate, of Eurasian milfoil, water chestnuts, and other nonnative plants in the Lake Champlain basin, Vermont. SEC. 3158. UPPER CONNECTICUT RIVER BASIN WETLAND RESTORATION, VERMONT AND NEW HAMPSHIRE.

(a) IN GENERAL.—The Secretary, in cooperation with the States of Vermont and New Hampshire, shall carry out a study and develop a strategy for the use of wetland restoration, soil and water conservation practices, and nonstructural measures to reduce flood damage, improve water quality, and create wildlife habitat in the Upper Connecticut River watershed. (b) COOPERATIVE AGREEMENTS.—In conducting the study and developing the strategy under this section, the Secretary may enter into one or more cooperative agreements to provide technical assistance to appropriate Federal, State, and local agencies and nonprofit organizations with wetland restoration experience. Such assistance may include assistance for the implementation of wetland restoration projects and soil and water conservation measures. (c) IMPLEMENTATION.—The Secretary shall carry out development and implementation of the strategy under this section in cooperation with local landowners and local government officials. (d) AUTHORIZATION OF APPROPRIATIONS.—There is authorized to be appropriated to carry out this section $5,000,000, to remain available until expended.

Study.

SEC. 3159. UPPER CONNECTICUT RIVER BASIN ECOSYSTEM RESTORATION, VERMONT AND NEW HAMPSHIRE.

dkrause on GSDDPC44 with PUBLAW

(a) GENERAL MANAGEMENT PLAN DEVELOPMENT.— (1) IN GENERAL.—The Secretary, in cooperation with the Secretary of Agriculture and in consultation with the States of Vermont and New Hampshire and the Connecticut River Joint Commission, shall conduct a study and develop a general management plan for ecosystem restoration of the Upper Connecticut River ecosystem for the purposes of— (A) habitat protection and restoration; (B) streambank stabilization; (C) restoration of stream stability; (D) water quality improvement; (E) aquatic nuisance species control; (F) wetland restoration; (G) fish passage; and (H) natural flow restoration. (2) EXISTING PLANS.—In developing the general management plan, the Secretary shall depend heavily on existing plans for the restoration of the Upper Connecticut River.

VerDate Aug 31 2005

13:52 Jan 23, 2009

Jkt 059194

PO 00001

Frm 01147

Fmt 6580

Sfmt 6581

Study.

M:\STATUTES\2007\59194PT1.001

APPS10

PsN: 59194PT1