Page:United States Statutes at Large Volume 121.djvu/1301

From Wikisource
Jump to navigation Jump to search
This page needs to be proofread.
[121 STAT. 1280]
PUBLIC LAW 110-000—MMMM. DD, 2007
[121 STAT. 1280]

121 STAT. 1280

PUBLIC LAW 110–114—NOV. 8, 2007

(7) perform one time stormproofing of interior pump stations to ensure the operability of the stations during hurricanes, storms, and high water events; (8) repair, replace, modify and improve non-Federal levees and associated protection measures in Terrebonne Parish; and (9) reduce the risk of storm damage to the greater New Orleans metropolitan area by restoring the surrounding wetlands through measures to begin to reverse wetland losses in areas affected by navigation, oil and gas, and other channels and through modification of the Caernarvon Freshwater Diversion structure or its operations. (b) COST SHARING.—Activities authorized by subsection (a) and section 7013 shall be carried out in a manner that is consistent with the cost-sharing requirements specified in the Emergency Supplemental Appropriations Act for Defense, the Global War on Terror, and Hurricane Recovery, 2006 (Public Law 109–234). (c) CONDITIONS.—The Secretary shall notify the Committee on Transportation and Infrastructure of the House of Representatives and the Committee on Environment and Public Works of the Senate if estimates for the expenditure of funds on any single project or activity identified in subsection (a) exceeds the amount specified for that project or activity in the Emergency Supplemental Appropriations Act for Defense, the Global War on Terror, and Hurricane Recovery, 2006. No appropriation in excess of 25 percent above the amount specified for a project or activity in such Act may be made until an increase in the level of expenditure has been approved by resolutions adopted by the Committee on Transportation and Infrastructure of the House of Representatives and the Committee on Environment and Public Works of the Senate.

Notification.

SEC. 7013. MISSISSIPPI RIVER-GULF OUTLET. Effective date.

dkrause on GSDDPC44 with PUBLAW

Deadline. Reports.

VerDate Aug 31 2005

13:52 Jan 23, 2009

Jkt 059194

(a) DEAUTHORIZATION.— (1) IN GENERAL.—Effective beginning on the date of submission of the plan required under paragraph (3), the navigation channel portion of the Mississippi River-Gulf Outlet element of the project for navigation, Mississippi River, Baton Rouge to the Gulf of Mexico, authorized by the Act entitled ‘‘An Act to authorize construction of the Mississippi River-Gulf outlet’’, approved March 29, 1956 (70 Stat. 65) and modified by section 844 of the Water Resources Development Act of 1986 (100 Stat. 4177) and section 326 of the Water Resources Development Act of 1996 (110 Stat. 3717), which extends from the Gulf of Mexico to Mile 60 at the southern bank of the Gulf Intracoastal Waterway, is not authorized. (2) SCOPE.—Nothing in this paragraph modifies or deauthorizes the Inner Harbor navigation canal replacement project authorized by that Act of March 29, 1956. (3) CLOSURE AND RESTORATION PLAN.— (A) IN GENERAL.—Not later than 180 days after the date of enactment of this Act, the Secretary shall submit to the Committee on Environment and Public Works of the Senate and the Committee on Transportation and Infrastructure of the House of Representatives a final report on the deauthorization of the Mississippi River-Gulf outlet, as described under the heading ‘‘INVESTIGATIONS’’ under

PO 00001

Frm 01278

Fmt 6580

Sfmt 6581

M:\STATUTES\2007\59194PT1.001

APPS10

PsN: 59194PT1