Page:United States Statutes at Large Volume 72 Part 1.djvu/357

From Wikisource
Jump to navigation Jump to search
This page needs to be proofread.
[72 Stat. 315]
PUBLIC LAW 85-000—MMMM. DD, 1958
[72 Stat. 315]

72

STAT.]

PUBLIC LAW 85-500-JULY 3, 1958

315

SANTA A N A RIVER B A S I N

I n addition to previous authorizations, there is hereby authorized to be appropriated the sum of $8,000,000 for the prosecution of the comprehensive plan approved in the Act of June 22, 1936, as amended and supplemented by subsequent Acts of Congress.

Appropriation. 49 Stat. 1589.

SAN DIEGUITO RIVER B A S I N

The project for the San Dieguito River, California, is hereby authorized substantially in accordance with the recommendations of the Chief of Engineers in House Document Numbered 288, Eightyfifth Congress, at an estimated cost of $1,961,000. COLUMBIA RIVER BASIN

I n addition to previous authorizations, there is hereby authorized to be appropriated the sum of $112,000,000 for the prosecution of the projects and plans for the Columbia River Basin, including the Willamette River Basin, authorized by the Flood Control Act of June 28, 1938, and subsequent Acts of Congress, including the Flood Control Acts of May 17, 1950, and September 3, 1954. I n carrying out the review of House Document Numbered 531, Eighty-first Congress, second session, and other reports on the Columbia River and its tributaries, pursuant to the resolution of the Committee on Public Works of the United States Senate dated July 28, 1955, the Chief of Engineers shall be guided by flood control goals not less than those contained in said House Document Numbered 531. The preparation of detailed plans for the Bruces Eddy Dam and Reservoir on the North Fork of the Clearwater River, Idaho, substantially in accordance with the recommendations of the Chief of Engineers in Senate Document Numbered 51, Eighty-fourth Congress, is hereby authorized at an estimated cost of $1,200,000.

Appropriation.

52 Stat. 1222, 1225. 64 Stat. 177, 178. 68 Stat. 1264.

S A M M A M I S H RIVER BASIN

The project for flood protection and related purposes on the Sammamish River, Washington, is hereby authorized substantially as recommended by the Chief of Engineers in House Document Numbered 157, Eighty-fourth Congress, at an estimated cost of $825,000. TERRITORY OF ALASKA

The project for flood protection on Chena River at Fairbanks, Alaska, is hereby authorized substantially in accordance with the recommendations of the Chief of Engineers in House Document Numbered 137, Eighty-fourth Congress, at an estimated cost of $9,727,000. The project for flood protection at Cook Inlet, Alaska (Talkeetna), is hereby authorized substantially in accordance with the recommendations of the Chief of Engineers in House Document Numbered 34, Eighty-fifth Congress, at an estimated cost of $64,900. SEC. 204. That, in recognition of the flood-control accomplishments of the multiple-purpose Oroville Dam and Reservoir, proposed to be constructed on the Feather River by the State of California, there is hereby authorized to be appropriated a monetary contribution toward the construction cost of such dam and reservoir and the amount of such contribution shall be determined by the Secretary of the Army in cooperation with the State of California, subject to a finding by the Secretary of the Army, approved by the President, of economic justification for allocation of the amount of flood control, such funds to be administered by the Secretary of the Army: Provided, That

Oroville Dam and Reservoir, Calif. Appropriation.