This page needs to be proofread.
Scheduled launch | August 1974 | |
The fifth N-1 flight (scheduled for August 1974) would have carried fully operational L2 and L3 vehicles on an unmanned rehearsal of a manned lunarmission, but the flight was postponed, then cancelled, along with the N-1 project. |
1.6.1 L3 Specifications
- Launch weight .......................................... 5500 kg
- Launch vehicle ......................................... Soyuz; N-1
- Height ..................................................... 5.2 m
- Diameter of habitable module .................... 2.3 m by 3 m
- Span across deployed landing gear ........... 4.5 m (estimated)
- Habitable volume ..................................... about 4 m3 (estimated)
- Number of crew ....................................... 1