Page:Apollo Mission Simulator Instructor Handbook - Volume 1.djvu/8

From Wikisource
Jump to navigation Jump to search
This page needs to be proofread.

SM-6T-2-02

APOLLO MISSION SIMULATOR INSTRUCTOR HANDBOOK


Section Title Page
  2.5 Sequence Control Group 2-31
  2.5.1 Sequencing Configuration Reference 2-32
  2.5.2 Simulated Sequencing Systems (S/C Equivalent) 2-32
  2.5.3 Sequencing Simulation 2-32
  2.6 Environmental Control System 2-36
  2.6.1 ECS Configuration Reference 2-38
  2.6.2 Simulated ECS (S/C Equivalent) 2-38
  2.6.3 ECS Simulation 2-46
  2.6.4 AMS Environment System 2-50
  2.7 Service Propulsion System (SPS) 2-68
  2.7.1 SPS Configuration Reference 2-68
  2.7.2 Simulated SPS (S/C Equivalent) 2-68
  2.7.3 SPS Simulation 2-73
  2.8 Electrical Control System 2-76
  2.8.1 EPS Configuration Reference 2-76
  2.8.2 Simulated EPS (S/C Equivalent) 2-76
  2.8.3 EPS Simulation 2-93
  2.9 Communications and Data Systems (C&D) 2-100
  2.9.1 C&D System Configuration Reference 2-100
  2.9.2 Simulated C&D Systems (S/C Equivalent) 2-100
  2.9.3 C&D System Simulation 2-104
  2.10 Guidance and Navigation System 2-119
  2.10.1 G&N Configuration Reference 2-119
  2.10.2 Simulated G&N System (S/C Equivalent) 2-120
  2.10.3 Guidance & Navigation System Simulation 2-131
3 NOMINAL TRAINING MISSION 3-1
  3.1 Purpose and Scope 3-1
  3.2 Basic Mission Events 3-1
  3.3 Launch-Boost Phase 3-4
  3.4 Suborbital Aborts 3-10
  3.5 Orbital Navigation 3-10
  3.6 Retrograde, Entry and Recovery 3-30
  3.7 Simulation Initialization 3-30
  3.7.1 Prelaunch (S1) 3-40
  3.7.2 Launch (S2) 3-40
  3.7.3 Orbit Insertion (S3) 3-40
  3.7.4 First Orbital Routine Point (S4) 3-40
  3.7.5 Second Orbital Routine Point (S5) 3-48
  3.7.6 Third Orbital Routine Point (S6) 3-48
  3.7.7 Fourth Orbital Routine Point (S7) 3-48
  3.7.8 Preparation for Retro (S8) 3-48
  3.7.9 CM-SM Separation (S9) 3-48
  3.8 Basic Nominal Mission 3-48
  3.9 Nominal Mission, Plane Changes 3-57
  3.10 Nominal Mission, Hohmann Transfers 3-58
vi