Page:Cleaner Air, Cleaner Energy, Converting Forest Fire Management Waste to On Demand Renewable Energy CEC-500-2020-033.pdf/25

From Wikisource
Jump to navigation Jump to search
There was a problem when proofreading this page.

CHAPTER 2:
Powertainer Design and Validation Testing Results



Powertainer Design Summary

Under the scope of the engineering development, the project team designed and tested a beta 1 Powertainer prototype, which consists of the following subsystems, as presented in Figure 1:

  • Enclosure and Hopper Feed System
  • Gasifier and Filter
  • Flare
  • Genset
  • Exhaust Control System
  • Automation Controls

Figure 1: Powertainer Design Drawing Rendering with Major Subsystems Call-Outs

Source: All Power Labs (2020)

The following sections explain the design, engineering validation testing and design validation testing activities and the results of each subsystem.

Enclosure and Hopper Feed System, Engineering and Design Validation Testing

The Powertainer enclosure uses a 20-foot-long shipping container (Figure 2). The design added doors for additional access to strategic components; particularly the engine and gasifier,

13