Page:Cricket (Hutchinson, 1903).djvu/560

From Wikisource
Jump to navigation Jump to search
This page has been proofread, but needs to be validated.
420
CRICKET

Drainage

Should draining be necessary, this operation takes precedence of all other work in preparing the land. If rain pass freely through the soil, leaving no stagnant pools even in wet winters, the sufficiency of the natural drainage may be inferred. But it should be clearly understood that a fine turf cannot be established on a bog. Sour land soddened with moisture, or an impervious clay, must have pipes properly laid before good turf is possible, and as the trenches cannot be filled so firmly as to prevent the ground from sinking afterwards, draining must be completed at least six months before seed is sown. The size of the pipes must be determined by the rainfall of the district, the distance between the rows by the nature of the soil. The depth need not be great, as the roots of grass do not penetrate far into the earth. Fifteen feet between the rows, and the pipes three feet below the surface, are common measurements. No single drain should be very long, and the smaller should enter the larger pipes at an acute angle, to avoid arresting the flow of water. Near trees or hedges the sockets must be set in cement, or the roots may force admission and choke the drain, and the outflow ends should be examined periodically to ensure efficient working. In laying the pipes, it is necessary to employ a practical man who understands the business, and will consider the peculiar requirements of the case.