Page:Current Strategies for Engineering Controls in Nanomaterial Production and Downstream Handling Processes.pdf/39

From Wikisource
Jump to navigation Jump to search
This page has been proofread, but needs to be validated.

Table 1. Engineering controls and associated tasks for various industries

Process/task Engineering control Industry Reference
Reactor fugitive emissions Enclosure Nanotechnology Tsai et al. 2009b

Lee et al. 2011

Product harvesting Glovebox Nanotechnology Yeganeh et al. 2008
Reactor cleaning Spot LEV system/fume extractor Nanotechnology Methner 2008
Small-scale weighing Chemical fume hood Nanotechnology Tsai et al. 2009a

Ahn et al. 2008

Tsai et al. 2010

Biological safety cabinet Nanotechnology and laboratory Cena and Peters 2011

Macher and First 1984

Glovebox isolator Pharmaceutical Walker 2002

Hirst et al. 2002

Nano fume hood Pharmaceutical
Air curtain isolation hood Nanotechnology/research Tsai et al. 2010
Product discharge/bag filling Discharge/collar hood Silica and pharmaceutical ACGIH 2013

HSE 2003e

Hirst et al. 2002

Continuous liner Pharmaceutical Hirst et al. 2002
Inflatable seal Pharmaceutical Hirst et al. 2002
Bag/container

emptying

Bag dump station Silica HSE 2003d

Heitbrink and McKinnery 1986

Cecala et al. 1988

Large-scale weighing/handling Ventilated booth Pharmaceutical Hirst et al. 2002

Floura and Kremer 2008

HSE 2003b

Nanocomposite

machining

High velocity-low volume Woodworking
Wet suppression Nanotechnology Bello et al. 2009
Air filter change-out Bag in-bag out Pharmaceutical


3.3 Ventilation and General Considerations

It is important to confirm that the LEV system is operating as designed by regularly measuring exhaust airflows. A standard measurement - hood static pressure - provides important information on the hood performance, because any change in airflow results in a change in hood static pressure. For hoods designed to prevent exposures to hazardous airborne contaminants, the ACGIH Industrial Ventilation: A Manual of Recommended Practice for Operation and Maintenance recommends the installation of a fixed hood static pressure gauge [ACGIH 2010].


24

Current Strategies for Engineering Controls in Nanomaterial Production and Downstream Handling Processes