Federal Register / Vol. 85, No. 86 / Monday, May 4, 2020 / Presidential Documents


(f) The Task Force shall submit to the President, through the Chair and the Director of the Office of Management and Budget:

  1. a report within 1 year from the date of this order;
  2. a subsequent report at least once annually thereafter while the Task Force remains in existence; and
  3. such other reports as appropriate and as directed by the Chair.

(g) In the reports submitted under subsection (f) of this section, the Task Force shall summarize its progress, findings, and recommendations described in subsection (c) of this section.

(h) Because attacks on the bulk-power system can originate through the distribution system, the Task Force shall engage with distribution system industry groups, to the extent consistent with law and national security. Within 180 days of receiving the recommendations pursuant to subsection (c)(i) of this section, the FAR Council shall consider proposing for notice and public comment an amendment to the applicable provisions in the Federal Acquisition Regulation to implement the recommendations provided pursuant to subsection (c)(i) of this section.

Sec. 4. Definitions. For purposes of this order, the following definitions shall apply:

(a) The term “bulk-power system” means (i) facilities and control systems necessary for operating an interconnected electric energy transmission network (or any portion thereof); and (ii) electric energy from generation facilities needed to maintain transmission reliability. For the purpose of this order, this definition includes transmission lines rated at 69,000 volts (69 kV) or more, but does not include facilities used in the local distribution of electric energy.

(b) The term “bulk-power system electric equipment” means items used in bulk-power system substations, control rooms, or power generating stations, including reactors, capacitors, substation transformers, current coupling capacitors, large generators, backup generators, substation voltage regulators, shunt capacitor equipment, automatic circuit reclosers, instrument transformers, coupling capacity voltage transformers, protective relaying, metering equipment, high voltage circuit breakers, generation turbines, industrial control systems, distributed control systems, and safety instrumented systems. Items not included in the preceding list and that have broader application of use beyond the bulk-power system are outside the scope of this order.

(c) The term “entity” means a partnership, association, trust, joint venture, corporation, group, subgroup, or other organization.

(d) The term “foreign adversary” means any foreign government or foreign non-government person engaged in a long-term pattern or serious instances of conduct significantly adverse to the national security of the United States or its allies or the security and safety of United States persons.

(e) The term “person” means an individual or entity.

(f) The term “procurement” means the acquiring by contract with appropriated funds of supplies or services, including installation services, by and for the use of the Federal Government, through purchase, whether the supplies or services are already in existence or must be created, developed, demonstrated, and evaluated.

(g) The term “United States person” means any United States citizen, permanent resident alien, entity organized under the laws of the United States or any jurisdiction within the United States (including foreign branches), or any person in the United States.

Sec. 5. Recurring and Final Reports to the Congress. The Secretary is hereby authorized to submit recurring and final reports to the Congress regarding the national emergency declared in this order, consistent with section 401(c) of the NEA (50 U.S.C. 1641(c)) and section 204(c) of IEEPA (50 U.S.C. 1703(c)).