TOP SECRET – Sensitive

"c. Plan Three, which would deploy the 82nd Airborne Division but would leave Marine Corps battalions in CONUS. This plan would likewise envisage no Reserve callup and no legislative action."

Under Plan One, elements of one brigade of the 82nd Airborne Division could commence movement within 24 hours and the division itself 36-48 hours later. 6/9ths of a Marine Corps Division/wing team could be ready for deployment to Vietnam in one week without utilizing Vietnam replacement drafts. Dependent upon the availability of aircraft and the degree of drawdown on the current level of Southeast Asia airlift support, the deployment could be completed within three to four weeks.

Under Plan Two, elements of two CONUS Marine Divisions, consisting of 12 battalions could be air transported to Vietnam, although two weeks preparation be required. This deployment, however, would deplete Marine Corps assets except for three battalions -- one afloat in the Mediterranean, one afloat in the Caribbean, and one ashore at Guantanamo Bay, Cuba.

Under Plan Three, as under Plan One, elements of one brigade of the 82nd Airborne Division could commence movement in 24 hours, the division itself 36-48 hours later.

All of these plans, however, would require drawdowns on previously protected CONUS stocks during procurement lead-time for new production and would further aggravate the shortage of long procurement lead time items currently short, such as helicopters, tracked combat vehicles, and ammunition

In examining the capacity to meet the possibility of widespread civil disorder in the United States, the Joint Chiefs of Staff concluded that, whether or not deployments under any of the plans were directed, it appeared that sufficient forces would still be available for civil disorder control.

However, the Joint Chiefs of Staff cautioned that the residual CONUS-based active combat-ready ground forces that would result from the extension of each of the plans examined would be:

"a. Plan One - 6/9 Marine Division/Wing Team.
b. Plan Two - One Airborne Division.
TOP SECRET – Sensitive