strength to the very best advantage, and can then assign them daily tasks which are so just that the workman can each day be sure of earning the large bonus which is paid whenever he successfully performs this task.

There were about 600 shovelers and laborers of this general class in the yard of the Bethlehem Steel Company at this time. These men were scattered in their work over a yard which was, roughly, about two miles long and half a mile wide. In order that each workman should be given his proper implement and his proper instructions for doing each new job, it was necessary to establish a detailed system for directing men in their work, in place of the old plan of handling them in large groups, or gangs, under a few yard foremen. As each workman came into the works in the morning, he took out of his own special pigeonhole, with his number on the outside, two pieces of paper, one of which stated just what implements he was to get from the tool room and where he was to start to work, and the second of which gave the history of his previous day's work; that is, a statement of the work which he had done, how much he had earned the day before, etc. Many of these men were foreigners and unable to read and write, but they all knew at a glance the essence of this report, because yellow paper showed the man that he had failed to do his full task the day before, and informed him that he had not earned as much as $1.85 a day, and that none but high-priced men would be allowed to stay permanently with this