Page:Principles of scientific management.djvu/82

From Wikisource
Jump to navigation Jump to search
This page has been proofread, but needs to be validated.
78
THE PRINCIPLES OF SCIENTIFIC MANAGEMENT

a step or two toward the pile of bricks and back again each time a brick is laid.

He studied the best height for the mortar box and brick pile, and then designed a scaffold, with a table on it, upon which all of the materials are placed, so as to keep the bricks, the mortar, the man, and the wall in their proper relative positions. These scaffolds are adjusted, as the wall grows in height, for all of the bricklayers by a laborer especially detailed for this purpose, and by this means the bricklayer is saved the exertion of stooping down to the level of his feet for each brick and each trowelful of mortar and then straightening up again. Think of the waste of effort that has gone on through all these years, with each bricklayer lowering his body, weighing, say, 150 pounds, down two feet and raising it up again every time a brick (weighing about 5 pounds) is laid in the wall! And this each bricklayer did about one thousand times a day.

As a result of further study, after the bricks are unloaded from the cars, and before bringing them to the bricklayer, they are carefully sorted by a laborer, and placed with their best edge up on a simple wooden frame, constructed so as to enable him to take hold of each brick in the quickest time and in the most advantageous position. In this way the bricklayer avoids either having to turn the brick over or end for end to examine it before laying it, and he saves, also, the time taken in deciding which is the best edge and end to place on the outside of the wall. In most cases, also, he saves