Page:Project Mercury - A Chronology.pdf/41

From Wikisource
Jump to navigation Jump to search
This page has been proofread, but needs to be validated.
22
Project Mercury: A Chronology

1958 (Cont.)

During the Month of September

Study was started on the tracking and ground instrumentation networks for the manned satellite project. [1]

September 24-October 1

A series of meetings were held in Washington, with Robert R. Gilruth serving as chairman to draft a manned satellite program and provide a basic plan for meeting the objectives of this program. Others attending included 8. B. Batdorf, A. J. Eggers, Maxime A. Faget, George Low, Warren North, Walter C. Williams, and Robert C. Youngquist.[2]

October 1

NASA was activated in accordance with the terms of Public Law 85-568, and the nonmilitary space projects which had been conducted by the Advanced Research Projects Agency were transferred to the jurisdiction of the NASA. Concurrently, NACA, after a 43-year tenure, was inactivated, and its facilities and personnel became a part of NASA.[3]

During the Year

The Navy space proposal to the Advanced Research Projects Agency, during the tenure of that organization’s interim surveillance over national space projects, was known as Project Mer. This plan involved sending a man into orbit in a collapsible pneumatic glider. The glider and its occupant would be launched in the nose of a giant launch vehicle. After the glider had been placed in orbit, it would be inflated, and then flown down to a water landing.[4]

  1. NASA Space Task Group, Project Mercury [Quarterly] Status Report No. 1 for Period Ending January 31, 1959.
  2. NASA Minutes of Meeting, subject: Panel for Manned Space Flight, Sept. 24, 30 and Oct. 1, 1959.
  3. House Rpt. 67, 87th Cong., 1st Sess., p. 57.
  4. House Rpt. 1228, 86th Cong., 2d Sess., p. 4.