Page:Project Mercury - A Chronology.pdf/47

From Wikisource
Jump to navigation Jump to search
This page has been proofread, but needs to be validated.
30
Project Mercury: A Chronology

1958 (Cont.)

October

Virginia. These drops involved the use of a concrete-filled drum attached to an operating canister system. The purpose of this phase was to demonstrate the adequacy of the mechanical system of deploying the parachutes. Subsequently, the drops were made by the C-130’s at Pope Field, North Carolina, from low levels to perfect a means of extracting the spacecraft from the aircraft. Full-scale spacecraft and operating parachutes were used in these drops, and all operational features of the drop-test program were worked out. The next phase was the research and development drops offshore of Wallops Island, Virginia, and the objectives here were as follows: to study the stability of the spacecraft during free fall and with parachute support; to study the shock input to the spacecraft by parachute deployment; and to study and develop retrieving operations.[1]

Design work was started on the Little Joe vehicles and test model spacecraft.[2]

Dr. W. Randolph Lovelace II was appointed by NASA Headquarters as Chairman of a Special Committee on Life Sciences by T. Keith Glennan, the NASA Administrator. After prospective astronaut candidates were interviewed in Washington, D. C., those chosen for further consideration received medical examinations at the Lovelace Clinic in Albuquerque, New Mexico (see Feb. 1-14, 1959, entry).[3]

November 3

The initial contingent of military service aeromedical personnel reported for duty and began working on human factors, crew selection, and crew training plans for the manned spacecraft program.[4]

  1. Memo, George M. Low to NASA Administrator, subject: Status of Manned Satellite Project, November 25, 1958.
  2. Memo, George M. Low to NASA Administrator, subject: Status of Manned Satellite Project, November 25, 1958.
  3. House Document No. 454, 86th Cong., 2d Sess., subject: Third Semiannual Report of the National Aeronautics and Space Administration, Message from the President of the United States, Aug. 30, 1960.
  4. NASA Space Task Group, Project Mercury [Quarterly] Status Report No. 1, for Period Ending January 31, 1959.