Page:SELECTED ESSAYS of Dr. S. S. KALBAG.pdf/73

From Wikisource
Jump to navigation Jump to search
This page needs to be proofread.

________________

21 Aug 83 Pabal My dear Meia This last weele has been rätter evatful.- in a way. Hlucu 9 returned Wo Palund on 18th the rivers were in spale and I travelled via Khed. Auguet & 15416' recorded a Hot2494 79 mm. heghost in the season, bringing the total to near 450 mm. The rain was well spread and absorbed in the ground with little of floods. The ground water has now river very lech all sello me. virsen and Patent can stand á year og drought without problem. Our own well, aided by the breased Thas water to wither 3 feet from top - can you believe it? Our pusufo is daotalked, baseline erected ca er enn pump wielet to the top Though not to the tank for another day : Cement sheels Cour panels) are being fixed on the house a regularly produced even if rather slowly. This weeke Re walls of he ist unit will be ready & I hope the roof will be on by about 10th Sept. 1. Pabst is a beautiful place now, all sheams have running clean water - deké KódailcaualThe pound of walet es music to my ears. Eren our plot has a little nice stream of clean walu. I don't know how long it will kat . On the 'morado devet sleo. I have had some success Both my young engineers wanted to go to Bombay. I felt they were not Yelling the traith. By my porou coice Zulkee mural presocure, one of them came out clean to say he was sorry he had told me lies, he was going for an autubiew in Bombay & now he has decided not to go. I knew they were not telling the truth Rural Development Through Education System 60