Page:Syria and Palestine WDL11774.pdf/125

From Wikisource
Jump to navigation Jump to search
This page has been proofread, but needs to be validated.
Syria and
Palestine
]
MINERALS
109

1887 and 1906 were revised. They apply to all mineral obtained below ground, as well as to substances dug up in the open, and under minerals are included mineral springs, water containing salt, salt beds, &c. A permit is required for preliminary prospecting, even on land already in the possession of the prospector. Applications for prospecting rights are made to provincial governors, and if approved are granted on designation of a surety and after a payment of £T5-15, according to the extent of the concession. The permit, however, is still subject to the approval of the Ministry of Forests and Mines, against whose decision there is a further appeal. Prospecting rights, when finally obtained, last for one year, with a possible extension to a second, and may be transferred. An export of 100 tons of the mineral is allowed, or more in special circumstances. The next step is the definitive application for the concession proper; it follows a prescribed form, and if made on behalf of a company, this must be certified to be composed of Ottoman subjects. On the authorities being satisfied that all is in order, the firman is issued to the concessionnaire on a payment, in proportion to the importance of the undertaking, of £T50-200 (for open digging, £T4). Concessions for underground mining usually run for 99 years, and can be inherited or otherwise disposed of. After the firman has been granted, the concessionnaire becomes liable to two taxes, a fixed annual sum of 10 piastres per hectare payable to the landlord, who is commonly the State, and a percentage of the gross output, varying from 10 per cent. to 20 per cent. for closed mines, and from 1 per cent. to 5 per cent. on products obtained in the open. Work must be begun within two years, subject to an extension of six months for special reasons, the concession then lapsing if the mine is still unworked. A responsible agent must be appointed; and except engineers and superintendents, the workmen must be Turkish subjects. Plant and work are subject to official inspection.