this a 40-foot flood and we have a water surface one hundred and ten feet above the bed of the canal.

In order to keep this immense volume of water from the canal it was proposed to build a large dam at Gamboa, and to convey the water by an entirely different and artificial route to the Atlantic. It is impossible to show on the map the whole drainage area of the Chagres, but a rough calculation shows it to be about 500 square miles. This seems a small total drainage area, but when it is considered that the annual rainfall is about 12 feet, that this rainfall is confined to about one half the year, and that in six consecutive hours there has been a precipitation of over six inches of rain, some idea of the amount of water that finds its way through the Chagres river during the wet season may be formed.

As I said before it was proposed to protect the canal from the waters of the upper Chagres by an immense dam at Gamboa, and for the purpose of controlling the water tributary to the lower Chagres two additional canals or channels were to be constructed on either side of the main canal. Thus, as the river is very tortuous and the axis of the canal crossed it twenty-five or thirty times, many deviations of the former became necessary. In some places the canal was to occupy the bed of the river and in others it cut across bends leaving the river for its original natural purpose of drainage. The difficulty in retaining the floods in these constructed channels would of course be immense, especially in some of the cases where the water rushing along its natural channel is suddenly turned at right angles into an artificial one. Thus it is clear that aside from the enormous expense incident to the removal of the immense amount of earth and rock necessary to complete the canal, that granting all this accomplished, it would be practically impossible to maintain a sea-level canal by reason of the difficulty in controlling the Chagres and preventing the canal from filling up.

The canal company finally came to the conclusion that the sea-level scheme was impracticable and it was abandoned, and plans were prepared for a lock system. As seen on the profile there were ten locks proposed, five on each side of the summit level. The summit level was to be 150 feet above sea level and consequently each lock would have a lift of thirty feet. The profile was constructed especially to show the amount remaining to be executed to complete the lock system, and a mere inspection will