Page:The Working and Management of an English Railway.djvu/164

From Wikisource
Jump to navigation Jump to search
This page has been validated.
134
AN ENGLISH RAILWAY.

examination, greasing, lamping, washing, cleaning, and warming of the carriages throughout the system, and it may be useful to give some account of the manner in which these very necessary operations are carried on.

Examination.—About one hundred carriage examiners are employed, who are stationed singly or in small gangs at the most important stations and junctions from one end of the line to the other. Before any man is appointed to a post of this kind he must have had previous experience in the lifting and repairs of carriages in the shops, and it is his duty to carefully examine the wheels, springs, and other running parts of all carriages standing at, or passing through, his station, tapping every wheel-tyre with his hammer, so that his experienced ear may detect by the sound whether they are in good order and without flaw. Where no special staff of coach repairers is employed, the examiner has also to attend to slight repairs of internal fittings, defective locks, etc. At the more important stations pits are provided between the rails to enable the examiners to get beneath the carriages to inspect the under-gear.

Greasing.—This is attended to by men stationed at the principal stations and junctions under the orders of the examiners, their duty being simply to examine the axle-boxes of every carriage passing through their station, and replenish them with oil or grease when required.

Washing.—Every carriage is washed outside with water once each day, the water being usually obtained from cast-iron tanks let into the ground, with a self-acting ball-valve. The buckets can thus be filled instantaneously, without the loss of time involved in