Page:The Working and Management of an English Railway.djvu/96

From Wikisource
Jump to navigation Jump to search
This page has been validated.
82
AN ENGLISH RAILWAY.

by a fitter and his assistant, whose duty it is to carefully examine, clean, oil and, if necessary, repair the locking apparatus, particulars of the work done being entered in a monthly report, which is sent through the district inspector to the head office at Crewe.

Heavy repairs and renewals are executed by an extra gang, attached to each district, in charge of a responsible foreman, the most stringent rules being laid down as to the manner in which the work is to be carried out, so as to provide for the safe and uninterrupted conduct of the traffic during the time it is going on.

In order to secure uniformity in the sighting of the signals, the following rules are, as far as possible, adhered to, but these rules are always subject to modification so as to meet special circumstances such as, for instance, where bridges, trees, or other natural objects, or sharp curves, would otherwise obscure the sight of the signals.

Home Signals.—To be fixed within sight of the distant signal, and to be erected as near the signal cabin as possible, so that a driver, whose engine is standing at the signal, may be verbally communicated with, if necessary, by the signalman.

Distant Signals.—To be fixed at a uniform distance of i,ooo yards from the home signal, unless the gradient is a rising one, in which case a distance of 8oo yards is considered sufficient. In special cases, a distant signal may be fixed a maximum distance of 1,200 yards from the home signal, where the circumstances admit of a sufficiently direct route for the wire connections to enable the signal to work freely.

Junction Signals.—The same rules apply to these as to home signals. They are to be fixed near the facing points to which they apply, and in no case at a greater