which was not in Japanese hands at the time when the Year Book was published.

Next comes the Taochung Iron Mine, Anhui province. "The concession which was granted to the Sino-Japanese Industrial Development Co. will be worked by the Orient Steel Manufacturing Co. The mine is said to contain 60,000,000 tons of ore, containing 65 per cent. of pure iron. The plan of operations provides for the production of pig iron at the rate of 170,000 tons a year, a steel mill with a capacity of 100,000 tons of steel ingots a year, and a casting and forging mill to produce 75,000 tons a year."

The fourth mine is at Chinlingchen, in Shantung, "worked in conjunction with the Hengshan Colliery by the railway." I presume it is to be sold back to China along with the railway.

The fifth and last mine mentioned is the Penhsihu Mine, "one of the most promising mines in the nine mining areas in South Manchuria, where the Japanese are permitted by an exchange of Notes between the Chinese and Japanese Governments (May 25, 1915) to prospect for and operate mines. The seam of this mine extends from near Liaoyang to the neighbourhood of Penhsihu, and in size is pronounced equal to the Tayeh mine." It will be observed that this mine, also, was acquired by the Japanese as a result of the ultimatum enforcing the Twenty-one Demands. The Year Book adds: "The Japanese Navy is purchasing some of the Penhsihu output. Osaka ironworks placed an order for 15,000 tons in 1915 and the arsenal at Osaka in the same year accepted a tender for Penhsihu iron."

It will be seen from these facts that, as regards iron, the Chinese have allowed the Japanese to acquire