Page:UK Traffic Signs Manual - Chapter 8 - Part 1 (Traffic Safety Measures and Signs for Road). Designs 2009.pdf/110

From Wikisource
Jump to navigation Jump to search
There was a problem when proofreading this page.
SIGNING PRINCIPLES

D4.15ADDITIONAL SIGNS

SCHEME INFORMATION BOARD


7007.1 variant

D4.15.1 Relevant particulars of major construction or improvement scheme being carried out on road ahead. This sign should be located on the near side verge generally 1½ miles in advance of a major road scheme site, provided that there is no conflict with other signs or with junctions and no undue driver distraction will result. For off-line schemes where 2 mile and 1 mile advance works signs are not used, the sign should be located near to the commencement of the off-line works. As a matter of courtesy the local planning authority should be informed of the proposal to erect them.


D4.15.2 The words "Highways Agency" and "Department for Transport" may be varied to "Welsh Assembly Government", "Transport Scotland", "Department for Regional Development" or the name of the appropriate traffic or roads authority. The Highways Agency logo should be varied accordingly.

D4.15.3 The scheme board legend should be varied to reflect the relevant scheme details based on the principle contained in the above sign, i.e. route, location, type of scheme and opening details.

D4.15.4 Boards erected on non-highway land will require the landowner’s and local authority’s permission.


7008

D4.15.5 This sign for pedestrians gives details about the nature of street works, giving name of employer and contractor, emergency telephone number, and apology for inconvenience. Signs must be sited where they will not cause an obstruction.

SPEED CAMERAS

D4.15.6 Where speed cameras are to be used to enforce a reduced mandatory speed limit the use of speed camera signs and speed check area signs should be considered. Speed control is dealt with in Section D3.7.

D4.15.7 The initial speed camera signs and speed check area signs, as appropriate (see paragraphs D4.15.8 and D4.15.11), should be located in pairs, one on each side of the carriageway or slip road, within the verge, central reservation or works site.


109