Page:UK Traffic Signs Manual - Chapter 8 - Part 1 (Traffic Safety Measures and Signs for Road). Designs 2009.pdf/207

From Wikisource
Jump to navigation Jump to search
This page has been proofread, but needs to be validated.
DUAL CARRIAGEWAY ROADS

D6.18WORKS ZONE

D6.18.1 The works zone starts at the beginning of the longitudinal safety zone and continues to the end of the works area.

D6.18.2 For full contra-flow layouts the works area should include a continuous and unobstructed emergency route through the site, available for use at all times.

D6.18.3 List of plans:

Plan DZD1 Works zone for a full lane closure on a dual carriageway road with a permanent speed limit of 40 mph or less

Plan DZD2 Works zone with the running lane on the same carriageway

Plan DZD3 Works zone showing a buffer lane

Plan DZD4 Works zone showing a buffer zone

Plan DZD5 Works zone with narrow lanes

Plan DZD6 Works zone including a junction (primary carriageway)

Plan DZD7' Works zone including a junction (secondary carriageway)


206