CONVOY WORKING

NOTES:

  1. For one-way working, signs should be provided only for traffic in the relevant direction.
  2. For two-way working the same signing is used on the primary and secondary approaches to the works. When "STOP/GO" boards are used, the legend on diagram 7027 shall be changed by substituting "STOP SIGN" for "RED LIGHT". The position of the sign in relation to the signals or "STOP/GO" boards shall be the same as the sign to diagram 7011 shown in Plan SC7.
  3. A pair of speed limit signs must be placed at the point where the temporary limit begins, and repeater signs should be placed throughout the works site at 200 m intervals on alternate sides of the road.
  4. Position each sign so that it does not obscure any other sign and is not obscured itself.
  5. The end of the restrictions may be indicated by a sign to diagram 7001 with an "End" plate to diagram 645. If the temporary speed limit masks a change in the permanent speed limit at some point within the works, a sign showing the new limit must be erected on each side of the carriageway at the end of the works.
  6. The sign to diagram 7026 should be repeated at 200m intervals through the site.
  7. When "STOP/GO” boards are used, the legend on diagram 7028 shall be changed by substituting "AT TRAFFIC CONTROL" for "WHEN GREEN LIGHT SHOWS".
  8. The extent of the area provided for convoy vehicles to turn should be assessed to ensure adequate clearances.