Page:UK Traffic Signs Manual - Chapter 8 - Part 2- Traffic Safety Measures and Signs for Road Works and Temporary Situations) - Operations 2009.pdf/137

From Wikisource
Jump to navigation Jump to search
There was a problem when proofreading this page.
MOBILE LANE CLOSURE TECHNIQUE

Plan MLC5: Mobile Lane Closure of two off side traffic lanes (lanes 2 and 3 on a three-lane carriageway) with and without a hard shoulder


135