Page:United States Statutes at Large Volume 104 Part 4.djvu/304

From Wikisource
Jump to navigation Jump to search
This page needs to be proofread.

104 STAT. 2620 PUBLIC LAW 101-549—NOV. 15, 1990 a qualifying clean coal technology to comply with the requirements under section 405. The owner or operator shall, as part of any such demonstration, provide, not later than January 1, 2000, satisfactory documentation of a preliminary design and engineering effort for such repowering and an executed and binding contract for the majority of the equipment to repower such unit and such other information as the Administrator may require by regulation. The replacement of an existing utility unit with a new utility unit using a repowering technology referred to in section 402(2) which is located at a different site, shall be treated as repowering of the existing unit for purposes of this title, if— "(1) the replacement unit is designated by the owner or operator to replace such existing unit, and "(2) the existing unit is retired from service on or before the date on which the designated replacement unit enters commercial operation. "(b) EXTENSION. — (1) An owner or operator satisfying the requirements of subsection (a) shall be granted an extension of the emission limitation requirement compliance date for that unit from January 1, 2000, to December 31, 2003. The extension shall be specified in the permit issued to the source under section 408, together with any compliance schedule and other requirements necessary to meet second phase requirements by the extended date. Any unit that is granted an extension under this section shall not be eligible for a waiver under section 1110*) of this Act, and shall continue to be subject to requirements under this title as if it were a unit subject to section 405. "(2) If (A) the owner or operator of an existing unit has been granted an extension under paragraph (1) in order to repower such unit with a clean coal unit, and (B) such owner or operator demonstrates to the satisfaction of the Administrator that the repowering technology to be utilized by such unit has been properly constructed and tested on such unit, but nevertheless has been unable to achieve the emission reduction limitations and is economically or technologically infeasible, such existing unit may be retrofitted or repowered with equipment or facilities utilizing another clean coal technology or other available control technology^-^ "(c) ALLOWANCES. —(1) For the period of the extension under this section, the Administrator shall allocate to the owner or operator of the affected unit, annual allowances for sulfur dioxide equal to the affected unit's baseline multiplied by the lesser of the unit's federally approved State Implementation Plan emissions limitation or its actual emission rate for 1995 in lieu of any other allocation. Such allowances may not be transferred or used by any other source to meet emission requirements under this title. The source owner or operator shall notify the Administrator sixty days in advance of the date on which the affected unit for which the extension has been granted is to be removed from operation to install the repowering technology. "(2) Effective on that date, the unit shall be subject to the requirements of section 405. Allowances for the year in which the unit is removed from operation to install the repowering technology shall be calculated as the product of the unit's baseline multiplied by 1.20 Ibs/mmBtu, divided by 2,000, and prorated accordingly, and are transferable. "(3) Allowances for such existing utility units for calendar years after the year the repowering is complete shall be calculated as