Page:United States Statutes at Large Volume 105 Part 1.djvu/542

From Wikisource
Jump to navigation Jump to search
This page needs to be proofread.

105 STAT. 514 PUBLIC LAW 102-104—AUG. 17, 1991 Project, Emeryville Point Park Marina dated November 1988. The cost sharing for this project shall be in accordance with the provisions of title I, section 103, of Public Law 99-662 for hurricane and storm damage reduction: Provided further. That the Secretary of the Army, acting through the Chief of Engineers, is directed to construct the San Timoteo feature of the Santa Ana River Mainstem flood control project by scheduling design and construction. The Secretary is further directed to initiate and complete design and to fund and award all construction contracts necessary for completion of the San Timoteo feature. Furthermore, the Corps of Engineers is directed to use $2,000,000 of the funds appropriated herein to initiate the design: Provided further. That using $1,252,000 previously appropriated for the Hansen Dam, California, project, the Secretary of the Army, acting through the Chief of Engineers, is directed to plan, dei»gn and construct a swim lake and associated recreational facilities at Hansen Dam as described in the February 1991 Hansen Dam Master Plan prepared by the United States Army Corps of Engineers Los Angeles District: Provided further. That the Secretary of the Army, acting through the Chief of Engineers, is authorized and directed to pursue the acquisition of MoUicy Farms for environmental restoration, flood control and navigation and the completion of the Ouachita-Black Rivers navigation project in Louisiana and Arkansas in accordance with law and the revised General Design Memorandum for the project, including required cutoffs and bendway widenings in Louisiana and Arkansas, The Federal Government is authorized to advance rights-of-way acquisition funds for the cutoffs and bendway widenings at Federal expense, and the States of Louisiana and Arkansas shall have 10 years after construction begins to repay its portion of the costs: Provided further, That the Secretary of the Army, acting through the Chief of Engineers, shall include as project costs in accordance with the Post Authorization Change Report, dated April 1989, as revised in January 1990, the costs for aesthetics for the Brush Creek, Kansas City, Missouri, project, which shall be shared with non-Federal interests under the provisions of section 103(a) of Public Law 99-662: Provided further. That with funds heretofore, herein or hereafter appropriated, the Secretary of the Army, acting through the Chief of Engineers, is directed to award continuing contracts until construction is complete in accordance with the terms and conditions of Public Law 101-101 for the O'Hare Reservoir, Illinois, and Wallisville Lake, Texas, projects: Provided further. That with funds appropriated herein and hereafter for the Lake Pontchartrain and Vicinty, Louisiana Hurricane Protection project, the Secretary of the Army is authorized and directed to provide parallel hurricane protection along the entire lengths of the Orleans Avenue and London Avenue Outfall Canals by raising levees and improving flood protection works along and parallel to the entire lengths of the outfall canals and other pertinent work necessary to complete an entire parallel protection system, to be cost shared as an authorized project feature, the Federal cost participation in which shall be 70 percent of the total cost of the entire parallel protection system, and the local cost participation in which shall be 30 percent of the total cost of such entire parallel protection system: Provided further. That the Secretary of the Army, acting through the Chief of Engineers, is jdirected to construct project modifications for improvement of the environment, as part of the Anacostia River Flood Control and Navigation project. District of Columbia and Maryland, within