106 STAT. 1316 PUBLIC LAW 102-377—OCT. 2, 1992 Ste. Genevieve, Missouri, $750,000; Passaic River Mainstem, New Jersey, $10,000,000; and Red River Waterway, Shreveport, Louisiana, to Daingerfield, Texas, $2,800,000: Provided further, That using $320,000 of the funds appropriated herein, the Secretary of the Army, acting through the Unief of Engineers, is directed to continue the cost-shared feasibility study of the Calleguas Creek, California, project based on the reconnaissance phase analyses of full intensification benefits resulting from a change in cropping patterns to more intensive crops within the floodplain. The feasibility study will consider the agricultural benefits using both traditional and nontraditional methods, and will include an evaluation of the benefits associated with the environmental protection and restoration of Mugu Lagoon: Provided further, That using $200,000 of the funds appropriated herein, the Secretary of the Aniiy, acting through the Chief of Engineers, is directed to conduct a cost-shared feasibility study for flood control at Norco Bluffs, California, based on flood related flows and channel migration which have caused bank destabilization and damaged private property and public utilities in the area: Provided further. That using $300,000 of the funds appropriated herein, the Secretary of the Army, acting through the Chief of Engineers, is directed to expand the study of long-term solutions to shoaling problems in Santa Cruz Harbor, California, by incorporating the study of erosion problems between the harbor and the easterly limit of the City of Capitola, particularly beach-fill type solutions which use sand imported from within or adjacent to the harbor: Provided further. That using $210,000 of the funds appropriated herein, the Secretary of the Army, acting through the Chief of Engineers, is directed to include the study of Alafia River as part of the Tampa Harbor, Alafia River and Big Bend, Florida, feasibility study: Provided further. That the Secretary of the Army, acting through the Chief of Engineers, is directed to undertake a study of a greenway corridor along the Ohio River in New Albany, Clarksville, and Jeffersonville, Indiana, using $125,000 of the funds appropriated under this heading in Public Law 101-101 for Jeffersonville, Indiana, $127,000 of the funds appropriated under this heading in Public Law 101-514, and $250,000 of the funds appropriated under this heading in Public Law 102-104: Provided further. That using $450,000 of the funds appropriated herein, the Secretary of the Army, acting through the Chief of Engineers, is directed to continue the development of a comprehensive waterfront plan for the White River in central Indianapolis, Indiana: Provided further, That using $250,000 of the funds appropriated herein, the Secretary of the Army, acting through the Chief of Engineers, is directed to conduct a feasibility study of the Muddy River, Boston, Massachusetts: Provided further, That using $50,000 of the funds appropriated herein, the Secretary of the Army, acting through the Chief of Engineers, is directed to undertake feasibility phase studies for the Clinton River Spillway, Michigan, project: Provided further, That using $600,000 of the funds appropriated herein and $900,000 of the funds appropriated under this heading in Public Law 102-104, the Secretary of the Army, acting through the Chief of Engineers, is directed to continue preconstruction engineering and design of the St. Louis Harbor, Missouri and Illinois, project: Provided further. That using $3,500,000 of the funds appropriated herein, the Secretary of the Army, acting through the Chief of
�