Page:United States Statutes at Large Volume 106 Part 4.djvu/440

From Wikisource
Jump to navigation Jump to search
This page needs to be proofread.

106 STAT. 3176 PUBLIC LAW 102-495—OCT. 24, 1992 public comment on the report prior to its submission to the Congress. (e) Upon the appropriation of the sum provided for in section 3(b) for the acquisition of the Projects and the determination that dam removal is necessary, the owner and local industrial consumer shall convey to the United States, through the Secretary, title to the Projects, including all property and all other rights and interests. Upon such conveyance and payment of the consideration as provided in section 3(b), and without further action by the United States, title shall transfer and vest in the United States, the owner and local industrial consimier shall be released from any further liability to the United States, as provided in section 3(b), and the acquisition from the owner and local industrial consumer shall be deemed to be completed. Effective date. SEC. 4. ECOSYSTEM AND FISHERIES RESTORATION. (a) Effective sixty days after submission of the report referred to in section 3(c) and following the conveyance in section 3(e), the Secretary is authorized and directed, subject to the appropriation of funds therefor, to take such actions as are necessary to implement— (1) the definite plan referred to in section 3(c)(2) for the removal of the dams and full restoration of the Elwha River ecosystem and native anadromous fisheries; (2) management of lands acquired pursuant to this Act which are located outside the exterior boundaries of the Park; and (3) protection of the existing quality and availability of water from the Elwha River for municipal and industried uses frompossible adverse impacts of dam removal. (b) The definite plan referred to section 3(c)(2) must include all actions reasonably necessary to maintain and protect existing water quality for the City of Port Angeles, Dry Creek Water Association, and the industrial users of Elwha River water against adverse impacts of dam removal. The cost of such actions, which may include as determined by the Secretary, if reasonably necessary, design, construction, operation and maintenance of water treatment or related facilities, shall be borne by the Secretary. Funds may not be appropriated for removal of the dams, unless, at the same time, funds are appropriated for actions necessary to protect existing water quality. (c) Nothing in this section shall be construed as an entitlement for which a claim against the United States may be made under the Tucker Act. SEC. 5. PROJECT OPERATION AND REPLACEMENT POWER. (a) Notwithstanding any other provision of law, neither the Federal Energy Regulatory Commission nor any other agency of the Federal Government shall have the authority or jurisdiction to issue a permanent license or similar order with respect to either Project prior to conveyance as provided in section 3(e), except that the Commission shall have jurisdiction under the Federal Power Act and is hereby authorized and directed to issue or maint£dn in effect annual licenses or authorizations for both Projects, authorizing continued operation of both Projects by the owner and local industrial consumer, such operation to be under such terms and conditions and in accordance with such practices as existed on September 1, 1992, until (1) the date the Secret£uy has acquired