Page:United States Statutes at Large Volume 106 Part 6.djvu/160

From Wikisource
Jump to navigation Jump to search
This page needs to be proofread.

106 STAT. 4718 PUBLIC LAW 102-575—OCT. 30, 1992 the Red Bluff Diversion Dam in a manner that provides for the use of associated Central Valley Project conveyance facilities ^ for delivery of water to the Sacramento Valley National Wildlife Refuge complex in accordance with the requirements of subsection (d) of this section. Costs associated with implementation of this paragraph shall be reimbursed in accordance with the following formula: 37.5 percent shall be reimbursed as main project features, 37.5 percent shall be considered a nonreimbursable Federal expenditure, and 25 percent shall be paid by the State of California. (11) rehabilitate and expand the Coleman National Fish Hatchery by implementing the United States Fish and Wildlife Service's Coleman National Fish Hatchery Development Plan, and modify the Keswick Dam Fish Trap to provide for its efficient operation at all project flow release levels and modify the basin below the Keswick Dam spillway to prevent the trapping of fish. Costs associated with implementation of this {>aragraph shall be reimbursed in accordance with the following brmula: 50 percent shall be reimbursed as main project features and 50 percent shall be considered a nonreimbursabldi Federal expenditure. (12) develop and implement a comprehensive program to provide flows to allow sufficient spawning, incubation, rearing, and outmigration for salmon and steelhead from Whiske3rtown Dam as determined by instream flow studies conducted by the California Department of Fish and Game after Clear Creek has been restored and a new fish ladder has been constructed at the McCormick-Saeltzer Dam. Costs associated with channel restoration, passage improvements, and fish ladder construction required by this paragraph shall be allocated 50 percent to the United States as a nonreimbursable expenditure and 50 percent to the State of California. Costs associated with providing the flows required by this paragraph shall be allocated among project purposes. (13) develop and implement a continuing program for the purpose of restoring and replenishing, as needed, spawning gravel lost due to the construction and operation of Centrm Valley Project dams, bank protection projects, and other actions that have reduced the availability of spawning gravel and rearing habitat in the Upper Sacramento River from Keswick Dam to Red Bluff Diversion Dam, and in the American and Stanislaus Rivers downstream from the Nimbus and (joodwin Dams, respectively. The program shall include preventive measures, such as re-establishment of meander belts and limitations on future bank protection activities, in order to avoid further losses of instream and riparian habitat. Costs associated with implementation of this paragraph shall be reimbursed in accordance with the following formula: 37.5 percent shall be reimbursed as main project features, 37.5 percent shall be considered a nonreimbursable Federal expenditure, and 25 percent shall be paid by the State of California. (14) develop and implement a program which provides for modified operations ana new or improved control structures at the Delta Cross Channel and Georgiana Slough during times when significant numbers of striped bass eggs, larvae, and juveniles approach the Sacramento River intake to the Delta Cross Channel or Georgiana Slough. Costs associated with