Page:United States Statutes at Large Volume 110 Part 4.djvu/146

From Wikisource
Jump to navigation Jump to search
This page needs to be proofread.

110 STAT. 2992 PUBLIC LAW 104-206—SEPT. 30, 1996 to complete the appraisal study and initiate preconstruction engineering and design for the Del Norte County and Crescent City, California, Wastewater Reclamation Project, and $250,000 shall be available to complete the appraisal study and initiate preconstruction engineering and design for the Fort Bragg, California, Water Supply Project. CONSTRUCTION PROGRAM (INCLUDING TRANSFER OF FUNDS) For construction and rehabilitation of projects and parts thereof (including power transmission facilities for Bureau of Reclamation use) and for other related activities as authorized by law, $394,056,000, to remain available until expended, of which $22,410,000 shall be available for transfer to the Upper Colorado River Basin Fund authorized by section 5 of the Act of April 11, 1956 (43 U.S.C. 620d), and $58,740,000 shall be available for transfer to the Lower Colorado River Basin Development Fund authorized by section 403 of the Act of September 30, 1968 (43 U.S.C. 1543), and such amounts as may be necessary shall be considered as though advanced to the Colorado River Dam Fund for the Boulder Canyon Project as authorized by the Act of December 21, 1928, as amended: Provided, That of the total appropriated, the amount for program activities which can be financed by the reclamation fund shall be derived from that fund: Provided further. That trsinsfers to the Upper Colorado River Basin Fund and Lower Colorado River Basin Development Fund may be increased or decreased by transfers within the overall appropriation under this heading: Provided further. That funds contributed by non-Federal entities for purposes similar to this appropriation shall be available for expenditure for the purposes for which contributed as though specifically appropriated for said purposes, and such funds shall remain available until expended: Provided further. That all costs of the safety of dams modification work at Coolidge Dam, San Carlos Irrigation Project, Arizona, performed under the authority of the Reclamation Safety of Dams Act of 1978 (43 U.S.C. 506), as amended, are in addition to the amount authorized in section 5 of said Act: Provided further. That section 301 of Public Law 43 USC 2241. 102-250, Reclamation States Emergency Drought Relief Act of 1991, is amended by inserting "1996, and 1997" in lieu of "and 1996": Provided further. That the amount authorized by section 210 of Public Law 100-557 (102 Stat. 2791), is amended to $56,362,000 (October 1996 prices plus or minus cost indexing), and funds are authorized to be appropriated through the twelfth fiscal year after construction funds are first made available: Provided further. That utilizing funds appropriated for the Tucson Aqueduct System Reliability Investigation, the Bureau of Reclamation is directed to complete, by the end of fiscal year 1997, the environmental impact statement being conducted on the proposed surface reservoir. The Bureau of Reclamation is further directed to work with the City of Tucson on any outstemding issues related to the preferred alternative. OPERATION AND MAINTENANCE For operation and maintenance of reclamation projects or parts thereof and other facilities, as authorized by law; and for a soil