Page:United States Statutes at Large Volume 112 Part 1.djvu/309

From Wikisource
Jump to navigation Jump to search
This page needs to be proofread.

PUBLIC LAW 105-178-JUNE 9, 1998 112 STAT. 283 No. 695. 696. 697. 698. 699. 700. 701. 702. 703. 704. 705. 706. 707. 708. 709. 710. 711. 712. 713. 714. 715. 716. 717. 718. State Florida Pennsylvania South Dakota West Virginia Ohio California Florida Ohio Illinois Tennessee Florida California Dist. of Columbia.. New Jersey Massachusetts Pennsylvania Illinois Georgia Michigan Massachusetts South Carolina Project description Construct interchange at 21st Street to provide access to Talleyrand Marine Terminal Gettysburg comprehensive road improvement study Construct Eastern Dakota expressways, to include construction of four-lane highways for South Dakota Highway 37 between Huron and Mitchell; U.S. Highway 83 between Pierre and 1-90; and U.S. Highway 12 between Aberdeen and 1-29 Construct Shawnee Parkway between junction with 1-73/74 Corridor and 1-77 Construct State Highway 121 from 1-30 to U.S. 67 in Cleburne Improve and construct SR 44/Jackson Street Interchange in Painesville Construct four-lane highway facility (Hollister Bypass), San Benito County Construct 1-4 reversible safety lane in Or- Relocate Harrison/Belmont U.S. 250 Widen 143rd Street in Orland Park Implement middle Tennessee alternative transportation system along the Stones River in Murfreesboro Construct County Road 470 Interchange with Florida Turnpike Implement safety and congestion mitigation improvements along Pacific Coast Conduct studies and related activities pertaining to proposed intermodal transportation center Construct Route 31 Fleming Bypass in Hunterdon County Construct TeleCom Boulevard with access via Commercial Street and Corporation Way to the west of Maiden River and With access via Santilli Highway to the east of the river in Everett, Medord and Improve access to Raystown in Huntingdon County Study upgrading Illinois 13/127 between Murphysboro and Pinckneyville Widen U.S. 84 South from U.S. 82 to the Ware County Line in Waycross and Ware Counties Improve drainage on 6th Street in Menominee Replace Brightman Street bridge in Pall Construct Newton Pike Extension between West Main Street to South Limestone in Lexington Construct pedestrian walkway and safety improvements along SC 277, Richland (Dollars in millions) 9.475 3 34.804 3.75 25 2 2.25 10.5 2 4 9.5 6 0.65 0.75 11.55 5.25 1.125 1.575 0.06 2.4 0.1125 7.23 6 0.8