Page:United States Statutes at Large Volume 112 Part 5.djvu/247

From Wikisource
Jump to navigation Jump to search
This page needs to be proofread.

PUBLIC LAW 105-317—OCT. 30, 1998 112 STAT. 3005 excluding U.S. Survey 944 and Native allotment A-442; Section 2 (unsurveyed), fractional, that portion lying above the mean high tide line of Icy Passage, excluding U.S. Survey 944 and U.S. Survey 945; Section 11 (unsurveyed), fractional, that portion lying above the mean high tide line of Icy Passage, excluding U.S. Survey 944; Section 12 (unsurveyed), fractional, NWy4NEy4, Wy2NWV4SWy4NE 1/4, and those portions of NWy4 and SWV4 lying above the mean high tide line of Icy Passage, excluding U.S. Survey 944 and Native allotment A-442. Containing approximately 1,015 acres. (2) Additional lands and acreage will be included as needed in the study area described in paragraph (1) to account for accretion to these lands from natural forces. (3) With the concurrence of the Secretary and the State of Alaska, the FERC shall determine the minimum amount of lands necessary for construction and operation of such project. (4) The National Park Service shall participate as a joint lead agency in the development of any environmental document under the National Environmental Policy Act of 1969 in the licensing of such project. Such environmental document shall consider both the impacts resulting from licensing and any land exchange necessary to authorize such project. (c) ISSUANCE OF LICENSE.— (1) A condition of the license to construct and operate any portion of the hydroelectric power project shall be FERC's approval, prior to any commencement of construction, of a finance plan submitted by Gustavus Electric Company. (2) The National Park Service, as the existing supervisor of potential project lands ultimately to be deleted from the Federal reservation in accordance with this Act, waives its right to impose mandatory conditions on such project lands pursuant to section 4(e) of the Federal Power Act (16 U.S.C. 797(e)). (3) FERC shall not license or relicense the project, or amend the project license unless it determines, with the Secretary's concurrence, that the project will not adversely impact the purposes and values of Glacier Bay National Park and Preserve (as constituted after the consummation of the land exchange authorized by this Act). Additionally, a condition of the license, or any succeeding license, to construct and operate any portion of the hydroelectric power project shall require the licensee to mitigate any adverse effects of the project on the purposes and values of Glacier Bay National Park and Preserve identified by the Secretary after the initial licensing. (4) A condition of the license to construct and operate any portion of the hydroelectric power project shall be the completion, prior to any commencement of construction, of the land exchange described in this Act. SEC. 4. ROLE OF SECRETARY OF THE INTERIOR. (a) SPECIAL USE PERMIT. —Notwithstanding the provisions of Gustavus the Wilderness Act (16 U.S.C. 1133-1136), the Secretary shall issue Electric Co. a special use permit to Gustavus Electric Company to allow the completion of the analyses referred to in section 3. The Secretary shall impose conditions in the permit as needed to protect the purposes and values of Glacier Bay National Park and Preserve. (b) PARK SYSTEM. — The lands acquired from the State of Alaska under this Act shall be added to and administered as part of the National Park System, subject to valid existing rights. Upon