PUBLIC LAW 108–7—FEB. 20, 2003
117 STAT. 135
Tug Forks of the Big Sandy River and Upper Cumberland River, Kentucky, $26,100,000: Provided, That, using $200,000 of the funds appropriated herein, the Secretary of the Army, acting through the Chief of Engineers, is directed to continue work on the Bois Brule Drainage and Levee District, Missouri, design deficiency project under the terms and conditions specified in Public Law 107–66: Provided further, That using $9,744,000 of the funds appropriated herein, the Secretary of the Army, acting through the Chief of Engineers, is directed to continue construction of the Dallas Floodway Extension, Texas, project, including the Cadillac Heights feature, generally in accordance with the Chief of Engineers report dated December 7, 1999: Provided further, That the Secretary of the Army, acting through the Chief of Engineers, is directed to use $4,000,000 of the funds appropriated herein to undertake the Bowie County Levee, Texas, project, which is defined as Alternative B, Local Sponsor Option, in the Corps of Engineers document entitled Bowie County Local Flood Protection, Red River, Texas, Project Design Memorandum No. 1, Bowie County Levee, dated April 1997: Provided further, That cost sharing for the Bowie County Levee, Texas, project shall be in accordance with the provisions of the Flood Control Act of 1946: Provided further, That the Secretary of the Army is directed to accept advance funds, pursuant to section 11 of the River and Harbor Act of 1925, from the non-Federal sponsor of the Los Angeles Harbor, California, project authorized by section 101(b)(5) of Public Law 106–541, which are needed to maintain the project schedule: Provided further, That using $1,000,000 of the funds provided herein, the Secretary of the Army, acting through the Chief of Engineers, is directed to conduct, at full Federal expense, technical studies of individual ditch systems identified by the State of Hawaii, and to assist the State in diversification by helping to define the cost of repairing and maintaining selected ditch systems: Provided further, That the Secretary of the Army, acting through the Chief of Engineers, is directed to use $1,000,000 of the funds appropriated herein to continue construction of the navigation project at Kaumalapau Harbor, Hawaii: Provided further, That the Secretary of the Army, acting through the Chief of Engineers, is directed to use $2,000,000 of the funds provided herein for Dam Safety and Seepage/Stability Correction Program to continue construction of seepage control features at Waterbury Dam, Vermont: Provided further, That the Secretary of the Army, acting through the Chief of Engineers, is directed to use $13,400,000 of the funds appropriated herein to proceed with planning, engineering, design or construction of the Grundy, Buchanan County, and Dickenson County, Virginia, elements of the Levisa and Tug Forks of the Big Sandy River and Upper Cumberland River Project: Provided further, That the Secretary of the Army, acting through the Chief of Engineers, is directed to use $5,500,000 of the funds appropriated herein to proceed with the planning, engineering, design or construction of the Lower Mingo County, Upper Mingo County, Wayne County, McDowell County, West Virginia, elements of the Levisa and Tug Forks of the Big Sandy River and Upper Cumberland River Project: Provided further, That the Secretary of the Army, acting through the Chief of Engineers, is directed
VerDate 11-MAY-2000
13:45 Aug 26, 2004
Jkt 019194
PO 00000
Frm 00161
Fmt 6580
Sfmt 6581
D:\STATUTES\2003\19194PT1.001
APPS10
PsN: 19194PT1
�