119 STAT. 1206
PUBLIC LAW 109–59—AUG. 10, 2005
No. 7.
8.
9.
10. 11.
12. 13. 14. 15.
16. 17.
State
Project Description
CA
Widening of Rosedale Highway between SR 43 and SR 99 in Bakersfield and widening of SR 178 between SR 99 and D street in Bakersfield ......................................................................
$60,000,000
Construction of the 36 mile segment of I–49 in LA between the Arkansas State line and I– 220 in Shreveport ...............................................
$150,000,000
Construction of an extension of I–530 from Pine Bluff, Arkansas to Wilmar, Arkansas to interstate specifications ..............................................
$40,000,000
Construction of the U.S. I–80 to I–88 NorthSouth Connector in Illinois ................................
$152,000,000
Construction and reconstruction of the U.S. Highway 41 corridor between Milwaukee and Green Bay, Wisconsin ........................................
$30,000,000
Construction of Route 34 Interchange and improvements in Illinois .........................................
$55,000,000
Increase capacity on I–80 between Sacrament/ Placer County Line and SR 65 ..........................
$50,000,000
Planning, design, and construction of Knik Arm Bridge ..................................................................
$30,000,000
Planning, design, right-of-way acquisition and construction of the Interstate Route 74 bridge from Bettendorf, Iowa, to Moline, Illinois ........
$15,000,000
Planning, design, and construction of the I–49/ Bella Vista Bypass in Arkansas ........................
$20,000,000
Planning, design, and construction of the I–73 corridor of national significance in South Carolina .......................................................................
$10,000,000 $100,000,000
LA
AR
IL WI
IL CA AK IA, IL
AR SC
Amount
18.
I–69 Corridor, including the Great River Bridge
$75,000,000
MN
Falls-to-Falls Corridor ...........................................
$50,000,000
21.
DC
Frederick Douglass Memorial Bridge ...................
$75,000,000
22.
CT
Pearl Harbor Memorial Bridge .............................
$35,000,000
23.
IN
I–80 Improvements ................................................
$10,000,000
24.
CA
State Route 4 East Upgrade ..................................
$20,000,000
25.
LA
LA 1 Replacement ..................................................
$5,000,000
26.
AZ
State Route 85 Upgrade ........................................
$3,000,000
27.
Jkt 039194
AR
20.
13:51 Oct 26, 2006
I–405 HOV lane ......................................................
19.
VerDate 14-DEC-2004
CA
WV
I–73/I–74 Corridor ..................................................
$50,000,000
PO 00002
Frm 00063
Fmt 6580
Sfmt 6581
E:\PUBLAW\PUBL002.119
APPS06
PsN: PUBL002
�