PUBLIC LAW 109–59—AUG. 10, 2005
119 STAT. 1285
Highway Projects High Priority Projects—Continued
No. 727 728 729 730 731 732 733 734 735 736
737
738 739 740
741 742 743 744 745 746 747 748 749 750 751 752 753
VerDate 14-DEC-2004
13:51 Oct 26, 2006
State
Project Description
MA
Improve traffic signal operations, pavement markings and regulatory signage, MiltonBoston City Line .............................................. Port Jervis, NY downtown pedestrian mall and promenade ................................................ Construct Soo Line Trail from north of Bowlus to the east side of Mississippi River .............. Construct traffic mitigation signals, signs, and other upgrades for Howard Ave, St. Francis Reconstruction of NH 11 and NH 28 Intersection in Alton ..................................................... Riverside Drive Improvements, Los Angeles .... Upgrade CA SR 4 East from the vicinity of Loveridge Road to G Street, Contra Costa County .............................................................. Widen SH 24 from a 2-lane facility to 4-lane divided facility from SH 19 to Cooper, TX .... Rail crossing signalization upgrade, Willow Street, Fleetwood, Berks ................................. Navajo Route 20/Navajo Nation, Coconino County, AZ/To Conduct a 2-lane road design for 28 miles of dirt road between the communities of Le Chee, Coppermine, and Gap Construct Hub City Connector Passage (12.5 miles of bicycle-pedestrian improvements, 176–SC 56), part of state-wide Palmetto Trail Project ..................................................... Construct U.S. 1/SR 100 Connector, Bunnell, Florida .............................................................. ............................................................................... Design and environmental analysis for State Route 11 connecting State Route 905 to the new East Otay Mesa Port of Entry, San Diego ................................................................. Improve North Fork Trail, Southold ................. Interstate Route H1 Deck Repair, Airport Viaduct ................................................................... Replace Grade Separation at Eastland and Sheldon Road, Berea ....................................... Widen I–5 through Lewis County ..................... Engineering, design, and construction of I–73 from the North Carolina State Line to I–95 Planning and construction of a bicycle trail adjacent to the I–90 and SR 615 Interchange in Lake County, OH ........................................ Widening of Boiling Springs 9 from Rainbow Lake Rd. to SC 292 ......................................... Construct Streetscape Project, Orland Hills ..... ............................................................................... Widening of Oregon Hwy 217 between Tualatin Valley Hwy and the U.S. 26 interchange, Beaverton ........................................... SR 10 widening, New Morgan Borough and Caernarvon Township, PA .............................. Widen M–72 from U.S. 31 easterly 7.2 miles to Old M–72 ......................................................... Widening of Rt. 22 and SR 26 in Huntingdon. Upgrades to the interchange at U.S. Rt. 22 and SR 26 .........................................................
NY MN WI NH CA CA TX PA AZ
SC
FL CA
NY HI OH WA SC OH SC IL OR PA MI PA
Jkt 039194
PO 00002
Frm 00142
Fmt 6580
Sfmt 6581
Amount
$1,200,000 $560,000 $396,000 $320,000 $560,000 $320,000 $16,000,000 $1,600,000 $260,320
$800,000
$800,000 $2,000,000 $0
$800,000 $200,000 $3,816,000 $600,000 $3,750,000 $8,000,000 $2,000,000 $4,800,000 $320,000 $0 $7,745,600 $1,600,000 $2,000,000 $2,700,000
E:\PUBLAW\PUBL002.119
APPS06
PsN: PUBL002
�