Page:United States Statutes at Large Volume 119.djvu/1348

From Wikisource
Jump to navigation Jump to search
This page needs to be proofread.

[119 STAT. 1330]
PUBLIC LAW 109-000—MMMM. DD, 2005
[119 STAT. 1330]

119 STAT. 1330

PUBLIC LAW 109–59—AUG. 10, 2005 Highway Projects High Priority Projects—Continued

No. 1887

1888 1889 1890 1891 1892 1893 1894 1895 1896 1897 1898 1899 1900 1901 1902 1903 1904 1905 1906 1907 1908 1909 1910 1911

VerDate 14-DEC-2004

13:51 Oct 26, 2006

Jkt 039194

PO 00002

State

Project Description

VA

Ceres Recreation Trail and Center—Design and construct pedestrian/bicycle trail in community of Ceres and establish trail center ..................................................................... Construction of trails within the Eastern Trail Management District ...................................... I–75 interchanges from north of Tifton to Turner County line ......................................... City of Savannah, Construct bike and pedestrian paths along Heritage Rail ..................... Implementation of the Advanced Traffic Management System, Boca Raton, FL .................. Lyell Avenue: NY Rt. 259 (Union Street) to Village Line, Village of Spenscerport, Town of Ogden ........................................................... Construct U.S. 151 between CTH D and SH 175, Fond du Lac County, WI ........................ Construct transportation enhancement projects, Toledo ................................................ Contruct grade separation at U.S. 59 and SH 99. Replace the proposed interim cloverleaf ramps at the intersection ............................... Gateways Transportation Enhancement Project, Hancock County ................................. Install Improvements for Pedestrian Safety including in the vicinity of IS X194 .................. Improvements to SH 412P at 412 Interchange Acquire right-of-way and construct East-West Connector from SR 37 to SR 563 in Lakeland, FL ............................................................ Design Valley Mall Blvd. for Main St. to I–82 and two I–82 interchanges at Mileposts 36 and 38 in Union Gap, WA .............................. Extension of Waaga Way west to Old Frontier Rd ..................................................................... Plan and construct highway access between U.S. Route 161 and U.S. Route 1 in Madawaska ...................................................... Randolph St. improvements between Wilmington Ave. and Fishburn Ave. in Huntington Park ..................................................... Reconstruct Azusa Ave. and San Gabriel Ave. for 2-way traffic in Azusa ............................... Construction of a 1.5 mile alternate truck route in Downs, Kansas .................................. Pedestrian Improvements for Columbiana, AL Reconstruct CSAH 91 from the D.M. and I.R. Railroad crossing at 8th Street in Duluth to CSAH 56, St. Louis County ............................ Construct Wayne County, NY rails to trails initiative ........................................................... Design and construct signal crossing and other safety improvements to Emerald Necklace Greenway Bicycle Trail, Town of Brookline .. Construction of Nonmotorized Pathway, City of Rockwood ..................................................... Purchase of scenic easement or site at I–90 and Highway 18 ..............................................

ME GA GA FL NY WI OH TX MS NY OK FL WA WA ME CA CA KS AL MN NY MA MI WA

Frm 00187

Fmt 6580

Sfmt 6581

E:\PUBLAW\PUBL002.119

Amount

APPS06

$120,000 $1,000,000 $800,000 $160,000 $1,600,000 $1,280,000 $3,000,000 $8,400,000 $4,000,000 $200,000 $250,000 $3,600,000 $4,000,000 $5,120,000 $400,000 $1,000,000 $960,000 $2,000,000 $400,000 $106,667 $4,000,000 $276,000 $600,000 $240,000 $480,000

PsN: PUBL002