119 STAT. 1330
PUBLIC LAW 109–59—AUG. 10, 2005 Highway Projects High Priority Projects—Continued
No. 1887
1888 1889 1890 1891 1892 1893 1894 1895 1896 1897 1898 1899 1900 1901 1902 1903 1904 1905 1906 1907 1908 1909 1910 1911
VerDate 14-DEC-2004
13:51 Oct 26, 2006
Jkt 039194
PO 00002
State
Project Description
VA
Ceres Recreation Trail and Center—Design and construct pedestrian/bicycle trail in community of Ceres and establish trail center ..................................................................... Construction of trails within the Eastern Trail Management District ...................................... I–75 interchanges from north of Tifton to Turner County line ......................................... City of Savannah, Construct bike and pedestrian paths along Heritage Rail ..................... Implementation of the Advanced Traffic Management System, Boca Raton, FL .................. Lyell Avenue: NY Rt. 259 (Union Street) to Village Line, Village of Spenscerport, Town of Ogden ........................................................... Construct U.S. 151 between CTH D and SH 175, Fond du Lac County, WI ........................ Construct transportation enhancement projects, Toledo ................................................ Contruct grade separation at U.S. 59 and SH 99. Replace the proposed interim cloverleaf ramps at the intersection ............................... Gateways Transportation Enhancement Project, Hancock County ................................. Install Improvements for Pedestrian Safety including in the vicinity of IS X194 .................. Improvements to SH 412P at 412 Interchange Acquire right-of-way and construct East-West Connector from SR 37 to SR 563 in Lakeland, FL ............................................................ Design Valley Mall Blvd. for Main St. to I–82 and two I–82 interchanges at Mileposts 36 and 38 in Union Gap, WA .............................. Extension of Waaga Way west to Old Frontier Rd ..................................................................... Plan and construct highway access between U.S. Route 161 and U.S. Route 1 in Madawaska ...................................................... Randolph St. improvements between Wilmington Ave. and Fishburn Ave. in Huntington Park ..................................................... Reconstruct Azusa Ave. and San Gabriel Ave. for 2-way traffic in Azusa ............................... Construction of a 1.5 mile alternate truck route in Downs, Kansas .................................. Pedestrian Improvements for Columbiana, AL Reconstruct CSAH 91 from the D.M. and I.R. Railroad crossing at 8th Street in Duluth to CSAH 56, St. Louis County ............................ Construct Wayne County, NY rails to trails initiative ........................................................... Design and construct signal crossing and other safety improvements to Emerald Necklace Greenway Bicycle Trail, Town of Brookline .. Construction of Nonmotorized Pathway, City of Rockwood ..................................................... Purchase of scenic easement or site at I–90 and Highway 18 ..............................................
ME GA GA FL NY WI OH TX MS NY OK FL WA WA ME CA CA KS AL MN NY MA MI WA
Frm 00187
Fmt 6580
Sfmt 6581
E:\PUBLAW\PUBL002.119
Amount
APPS06
$120,000 $1,000,000 $800,000 $160,000 $1,600,000 $1,280,000 $3,000,000 $8,400,000 $4,000,000 $200,000 $250,000 $3,600,000 $4,000,000 $5,120,000 $400,000 $1,000,000 $960,000 $2,000,000 $400,000 $106,667 $4,000,000 $276,000 $600,000 $240,000 $480,000
PsN: PUBL002
�