PUBLIC LAW 109–59—AUG. 10, 2005
119 STAT. 1355
Highway Projects High Priority Projects—Continued
No. 2533
2534 2535 2536 2537 2538
2539 2540 2541 2542 2543 2544 2545
2546 2547 2548 2549 2550 2551 2552
2553 2554 2555 2556 2557 2558 2559 2560
VerDate 14-DEC-2004
13:51 Oct 26, 2006
State
Project Description
TX
Conduct study of I–10 and U.S. 190 with a focus on congestion relief and the need for a military and emergency relief transportation corridor ............................................................. MD 85 at I270 ..................................................... SR 36 passing lanes north of Jackson to Newton County line, Butts County, Georgia ........ I–66 and Route 29 Gainesville Interchange Project .............................................................. Construct and extend existing pedestrian streetscape areas in Lynbrook ....................... Construct traffic intersection island improvements on North side of Olympic Blvd. where Irolo St. and Normandie Ave. split in Koreatown, Los Angeles ................................. Improvements in the SR 9 corridor in Snohomish County ..................................................... Replace a highway railcrossing in Osborne Borough, PA ..................................................... Pedestrian Improvements for Centerpoint, AL Replace twin 2 lane bridge with single 4 lane bridge on SR 138 over Big Rock Wash .......... State Route 86S and Ave. 50 highway safety grade separation .............................................. Construct Fredericksburg Road-Medical Drive grade separation in San Antonio ................... For design, engineering, ROW acquisition, and construction of a connector road between the Valmont Industrial Park and Pennsylvania Rt. 924 at Cranberry Creek ............................ Interstates 30/440/530 Interchanges/For interchange improvements, Little Rock ................. Rehabilitation of Benigno Boulevard from I295 to Route 168 in Bellmawr ............................... Preconstruction studies for improvement to U.S. 22 from Irving Street to Mickley Road Establish transportation museum on Navy Pier, Chicago .................................................... Continuing construction of I–90, Spokane to Idaho State Line .............................................. Improve transportation infrastructure for visitors to Jamestown 2007 .................................. Highway 67: Kiehl Avenue—Vandenberg Boulevard: rehabilitating and widening Highway 67 from four to six lanes from Kiehl Ave. to Vandenberg Blvd ................................ Install Improvements for Pedestrian Safety including in the vicinity of PS X81 ................... Memorial Drive Corridor .................................... Route 11 improvements in Maurertown, Virginia .................................................................. Street improvements, Whitemarsh Township .. Construction of the Lamoille Valley Rail Trail for the Vermont Association of Snow Travelers .................................................................. I–76: Colorados Northeast Gateway .................. Construct Maersk Terminal interchange in Portsmouth ...................................................... I–75 Welcom Project ...........................................
MD GA VA NY CA
WA PA AL CA CA TX PA
AR NJ PA IL WA VA AR
NY GA VA PA VT CO VA GA
Jkt 039194
PO 00002
Frm 00212
Fmt 6580
Sfmt 6581
Amount
$160,000 $4,000,000 $2,440,000 $8,000,000 $800,000
$200,000 $1,200,000 $1,720,000 $533,334 $400,000 $800,000 $3,040,000
$400,000 $1,200,000 $320,000 $800,000 $432,000 $2,640,000 $425,520
$2,960,000 $250,000 $1,600,000 $800,000 $1,200,000 $5,814,789 $6,133,334 $1,600,000 $200,000
E:\PUBLAW\PUBL002.119
APPS06
PsN: PUBL002
�