Page:United States Statutes at Large Volume 119.djvu/1397

From Wikisource
Jump to navigation Jump to search
This page needs to be proofread.

[119 STAT. 1379]
PUBLIC LAW 109-000—MMMM. DD, 2005
[119 STAT. 1379]

PUBLIC LAW 109–59—AUG. 10, 2005

119 STAT. 1379

Highway Projects High Priority Projects—Continued

No. 3159 3160 3161 3162 3163 3164 3165 3166 3167 3168 3169 3170 3171 3172 3173 3174

3175 3176 3177 3178 3179 3180 3181 3182 3183 3184 3185

VerDate 14-DEC-2004

13:51 Oct 26, 2006

State

Project Description

OH MI PA

Repair/Construct Mill Street Bridge, Akron ..... Resurface Caseville Road in Huron County ..... River Trail and Esplanade Development at the Southside Riverfront Park .............................. Construct access roads to National Great Rivers Research Center ........................................ Construct Roadway from Mississippi River Barge Dock to IL Rt. 3–IL Rt. 157, Cahokia Context Sensitive Design Elements for the Market Street Bridge, Lycoming County, PA Implement Pedestrian Safety Improvements on Queens Boulevard ...................................... Design and construct interchange on I–15 in Mesquite ........................................................... Construct grade separations at Washington Ave. and UPRR crossing east and Washington Ave. and La Cadena Drive in Colton Intercounty Connector ........................................ Charlemont Bridge, Route 2, Charlemont ........ CSAH 47 rehabilitation from 165th Ave. to TH 25, Morrison County ....................................... Improve Old Augusta Road and construct Kaiser Road, Perry County .................................. Reconstruction of U.S. 30 from PA 10 to Business U.S. 30 including travel lanes, shoulders, etc ............................................................ Route 78 (Transit Road), Genesee Street to Main Street, Towns of Amherst, Cheektowaga and Clarence in Erie County .. Planning and design, construction, and relocations for Southtowns Connector—NY Route 5 from Coast Guard Base to Ohio Street, including Fuhrmann Boulevard ........................ SR 91 I–605 Needs Assessment Study, Whittier, CA ............................................................. SR 70/Fulton Industrial Boulevard widening from Camp Creek Parkway to the SCL RR, Fulton County .................................................. Ste. Genevieve Co., Missouri Rt. 61 bridge replacement over Establishment Creek ............ Construction of intersection at County Road 5 and TH 13 in City of Burnsville .................... SR 307 overpass over Georgia Port Authority rail line, Savannah .......................................... Study railroad reconfiguration to eliminate highway crossings in and around Springfield, MO .......................................................... Construct relocated NC 16 in Lincoln and Catawba Counties, NC ........................................ Construction of highway approaches to the Sullivan Road bridge in Aurora, IL ............... Engineering and construction of 15.1 mile Alliance trail between Lock 14 in LaSalle and Lock 2 in Bureau Junction ............................. Construct parking facility and improve museum pedestrian access from trolley station, San Diego ......................................................... Relocation and upgrade of Beaner Hallow Rd., Beaver County, PA ..........................................

IL IL PA NY NV CA MD MA MN MS PA NY NY

CA GA MO MN GA MO NC IL IL CA PA

Jkt 039194

PO 00002

Frm 00236

Fmt 6580

Sfmt 6581

Amount $1,240,000 $153,600 $600,000 $1,000,000 $1,600,000 $1,200,000 $500,000 $800,000 $400,000 $4,800,000 $3,840,000 $352,000 $2,800,000 $4,000,000 $2,400,000

$8,560,000 $12,800 $1,200,000 $1,200,000 $2,400,000 $4,000,000 $800,000 $1,360,000 $1,280,000 $800,000 $800,000 $1,320,000

E:\PUBLAW\PUBL002.119

APPS06

PsN: PUBL002