Page:United States Statutes at Large Volume 121.djvu/1206

From Wikisource
Jump to navigation Jump to search
This page needs to be proofread.
[121 STAT. 1185]
PUBLIC LAW 110-000—MMMM. DD, 2007
[121 STAT. 1185]

PUBLIC LAW 110–114—NOV. 8, 2007

121 STAT. 1185

River basin, Pennsylvania, the Allegheny River basin, Pennsylvania, and the Upper Ohio River basin, Pennsylvania, to provide a level of flood protection sufficient to prevent future losses to communities located in such basins from flooding such as occurred in September 2004, but not less than a 100-year level of flood protection. (b) PRIORITY COMMUNITIES.—In carrying out this section, the Secretary shall give priority to the following Pennsylvania communities: Marshall Township, Ross Township, Shaler Township, Jackson Township, Harmony, Zelienople, Darlington Township, Houston Borough, Chartiers Township, Washington, Canton Township, Tarentum Borough, and East Deer Township. SEC. 4078. WILLIAMSPORT, PENNSYLVANIA.

The Secretary shall conduct a study of the project for flood control, Williamsport, Pennsylvania, authorized by section 5 of the Flood Control Act of June 22, 1936 (49 Stat. 1570), to investigate measures to rehabilitate the project. SEC. 4079. YARDLEY BOROUGH, PENNSYLVANIA.

The Secretary shall conduct a study to determine the feasibility of carrying out a project for flood damage reduction, at Yardley Borough, Pennsylvania, including the alternative of raising River Road. SEC. 4080. RIO VALENCIANO, JUNCOS, PUERTO RICO.

(a) IN GENERAL.—The Secretary shall conduct a study to reevaluate the project for flood damage reduction and water supply, Rio Valenciano, Juncos, Puerto Rico, authorized by section 209 of the Flood Control Act of 1962 (76 Stat. 1197) and section 204 of the Flood Control Act of 1970 (84 Stat. 1828), to determine the feasibility of carrying out the project. (b) CREDIT.—The Secretary shall credit toward the non-Federal share of the cost of the study the cost of work carried out by the non-Federal interest before the date of the partnership agreement for the project if the Secretary determines that the work is integral to the project. SEC. 4081. WOONSOCKET LOCAL PROTECTION PROJECT, BLACKSTONE RIVER BASIN, RHODE ISLAND.

The Secretary shall conduct a study, and, not later than June 30, 2008, submit to Congress a report that describes the results of the study, on the flood damage reduction project, Woonsocket, Blackstone River basin, Rhode Island, authorized by section 10 of the Flood Control Act of December 22, 1944 (58 Stat. 892), to determine the measures necessary to restore the level of protection of the project as originally designed and constructed. SEC. 4082. CROOKED CREEK, BENNETTSVILLE, SOUTH CAROLINA.

The Secretary shall conduct a study to determine the feasibility of carrying out a project for water supply, Crooked Creek, Bennettsville, South Carolina. SEC. 4083. BROAD RIVER, YORK COUNTY, SOUTH CAROLINA.

dkrause on GSDDPC44 with PUBLAW

The Secretary shall conduct a study to determine the feasibility of carrying out a project for water supply, Broad River, York County, South Carolina.

VerDate Aug 31 2005

13:52 Jan 23, 2009

Jkt 059194

PO 00001

Frm 01183

Fmt 6580

Sfmt 6581

M:\STATUTES\2007\59194PT1.001

APPS10

PsN: 59194PT1