Page:United States Statutes at Large Volume 121.djvu/1241

From Wikisource
Jump to navigation Jump to search
This page needs to be proofread.
[121 STAT. 1220]
PUBLIC LAW 110-000—MMMM. DD, 2007
[121 STAT. 1220]

121 STAT. 1220

PUBLIC LAW 110–114—NOV. 8, 2007

(d) FORMS OF ASSISTANCE.—In carrying out the project, the Secretary may enter into contracts or cooperative agreements with the non-Federal interests or provide reimbursements of project costs. (e) FEDERAL SHARE.—The Federal share of the cost of the project shall be 50 percent. (f) LIMITATION ON STATUTORY CONSTRUCTION.—Nothing in this section shall be construed to modify the prioritization of map updates or the substantive requirements of the Federal Emergency Management Agency flood map modernization program authorized by section 1360 of the National Flood Insurance Act of 1968 (42 U.S.C. 4101). (g) AUTHORIZATION OF APPROPRIATIONS.—There is authorized to be appropriated to carry out this section $2,000,000. SEC. 5070. RECONSTRUCTION OF ILLINOIS AND MISSOURI FLOOD PROTECTION PROJECTS.

dkrause on GSDDPC44 with PUBLAW

(a) IN GENERAL.—The Secretary may participate in the reconstruction of an eligible flood control project if the Secretary determines that such reconstruction is not required as a result of improper operation and maintenance of the project by the nonFederal interest. (b) COST SHARING.—The non-Federal share of the costs for the reconstruction of a flood control project authorized by this section shall be the same non-Federal share that was applicable to construction of the project. The non-Federal interest shall be responsible for operation and maintenance and repair of a project for which reconstruction is undertaken under this section. (c) RECONSTRUCTION DEFINED.—In this section, the term ‘‘reconstruction’’, as used with respect to a project, means addressing major project deficiencies caused by long-term degradation of the foundation, construction materials, or engineering systems or components of the project, the results of which render the project at risk of not performing in compliance with its authorized project purposes. In addressing such deficiencies, the Secretary may incorporate current design standards and efficiency improvements, including the replacement of obsolete mechanical and electrical components at pumping stations, if such incorporation does not significantly change the scope, function, and purpose of the project as authorized. (d) ELIGIBLE PROJECTS.—The following flood control projects are eligible for reconstruction under this section: (1) Clear Creek Drainage and Levee District, Illinois. (2) Fort Chartres and Ivy Landing Drainage District, Illinois. (3) Prairie Du Pont Levee and Sanitary District, including Fish Lake Drainage and Levee District, Illinois. (4) Cairo, Illinois Mainline Levee, Cairo, Illinois. (5) Goose Pond Pump Station, Cairo, Illinois. (6) Cottonwood Slough Pump Station, Alexander County, Illinois. (7) 10th and 28th Street Pump Stations, Cairo, Illinois. (8) Flood control levee projects in Brookport, Shawneetown, Old Shawneetown, Golconda, Rosiclare, Harrisburg, and Reevesville, Illinois. (9) City of St. Louis, Missouri. (10) Missouri River Levee Drainage District, Missouri.

VerDate Aug 31 2005

13:52 Jan 23, 2009

Jkt 059194

PO 00001

Frm 01218

Fmt 6580

Sfmt 6581

M:\STATUTES\2007\59194PT1.001

APPS10

PsN: 59194PT1