Page:United States Statutes at Large Volume 123.djvu/2872

From Wikisource
Jump to navigation Jump to search
This page needs to be proofread.

123STA T . 2 85 2 PUBLIC LA W 111 – 85 —O CT. 28 , 2 0 0 9SEC.1 1 7 .S ection3 111 ( 1 ) o f t h e Wa te rR e s o u rces D e v e l o pm ent A ct ,20 07( P u b lic L a w 110 – 11 4; 121 Stat. 1041) is amen d edb y insertin g after the word ‘ ‘before ’ ’, the following

‘‘, on and after’’. SEC. 11 8 . T he flood control pro j ect for West Sacramento, C ali - fornia, authori z ed by section 101(4), Water Resources Development Act, 1 9 92, Public Law 102– 5 80; E nergy and Water Development Appropriations Act, 1999, Public Law 105–245, is modified to authorize the Secretary of Army, acting through the Chief of Engi- neers, to construct the project at a total cost of $ 53,040,000 with an estimated first F ederal cost of $38,355,000 and an estimated non-Federal first cost of $14, 6 85,000. SEC. 119. Section 528(b)(3)(C)(ii) of the Water Resources Development Act of 1996 (110 Stat. 3769; 121 Stat. 1270) is amended — (1) in subclause ( I ), by stri k ing ‘‘subclause (II)’’ and inserting ‘‘subclauses (II) and (III)’’; and (2) by adding at the end the following: ‘‘(III) TE NMIL EC R EE KWAT ER P RE S ER V E AREA.—The Federal share of the cost of the Ten M ile Creek Water Preserve Area may e x ceed $25,000,000 by an amount e q ual to not more than $3,500,000, which shall be used to pay the Federal share of the cost of— ‘‘(aa) the completion of a post authoriza- tion change report; and ‘‘(bb) the maintenance of the Ten Mile Creek Water Preserve Area in caretaker status through fiscal year 2013.’’. SEC. 120. As soon as practicable after the date of enactment of this Act, from funds made available before the date of enactment of this Act for the Tampa H arbor B ig Bend Channel project, the Secretary of the Army shall reimburse the non-Federal sponsor of the Tampa Harbor Big Bend Channel project for the Federal share of the dredging work carried out for the project. SEC. 121. N otwithstanding any other provision of law, including section 103(c)(4) of Public Law 99–662 (33 U .S.C. 2213(c)(4)), the cost of any work carried out heretofore or hereafter on construction of the trail system authorized for the J . Percy Priest Dam and Reservoir, Tennessee by section 5132 of Public Law 110–114 (121 Stat. 1249) shall be a Federal cost, the total of which may not exceed $10,300,000. SEC. 122. Section 3112(1) of the Water Resources Development Act, 2007 (Public Law 110–114; 121 Stat. 1041) is amended by inserting after the word ‘‘before’’, the following: ‘‘, on and after’’. SEC. 123. Section 805(a)(2) of Public Law 106–541 (114 Stat. 2704) is amended by striking ‘‘2010’’ each place it appears and inserting ‘‘2013’’. SEC. 124. The Secretary of the Army is authorized to carry out the project for storm damage reduction, K ahuku, O ahu, Hawaii, at a total cost of $6,700,000, with an estimated Federal cost of $4,360,000 and an estimated non-Federal cost of $2,340,000. SEC. 125. The Secretary of the Army is authorized to acquire 24 parcels of land consisting of approximately 235 acres located within Township 21 South, Range 28 East, Sections 25, 26, 27, 34, 35 and 36, and Township 22 South, Range 28 East, Section 3 in Tulare County, for the Dam Safety Seismic Remediation project at Success Dam on the Tule River in the State of California, Land a cquis i t i o n .C a l i f o r nia. 16US C66 8 dd not e . 1 2 1 Stat. 11 3 6. 121 Stat. 1136.