Page:United States Statutes at Large Volume 124.djvu/2841

From Wikisource
Jump to navigation Jump to search
This page needs to be proofread.

124 STAT. 2815 PUBLIC LAW 111–267—OCT. 11, 2010 (1) IN GENERAL.—The Administrator shall, as soon as prac- ticable after the date of the enactment of this Act, initiate development of a Space Launch System meeting the minimum capabilities requirements specified in subsection (c). (2) MODIFICATION OF CURRENT CONTRACTS.—In order to limit NASA’s termination liability costs and support critical capabilities, the Administrator shall, to the extent practicable, extend or modify existing vehicle development and associated contracts necessary to meet the requirements in paragraph (1), including contracts for ground testing of solid rocket motors, if necessary, to ensure their availability for development of the Space Launch System. (c) MINIMUM CAPABILITY REQUIREMENTS.— (1) IN GENERAL.—The Space Launch System developed pursuant to subsection (b) shall be designed to have, at a minimum, the following: (A) The initial capability of the core elements, without an upper stage, of lifting payloads weighing between 70 tons and 100 tons into low-Earth orbit in preparation for transit for missions beyond low-Earth orbit. (B) The capability to carry an integrated upper Earth departure stage bringing the total lift capability of the Space Launch System to 130 tons or more. (C) The capability to lift the multipurpose crew vehicle. (D) The capability to serve as a backup system for supplying and supporting ISS cargo requirements or crew delivery requirements not otherwise met by available commercial or partner-supplied vehicles. (2) FLEXIBILITY.—The Space Launch System shall be designed from inception as a fully-integrated vehicle capable of carrying a total payload of 130 tons or more into low-Earth orbit in preparation for transit for missions beyond low-Earth orbit. The Space Launch System shall, to the extent practicable, incorporate capabilities for evolutionary growth to carry heavier payloads. Developmental work and testing of the core elements and the upper stage should proceed in parallel subject to appro- priations. Priority should be placed on the core elements with the goal for operational capability for the core elements not later than December 31, 2016. (3) TRANSITION NEEDS.—The Administrator shall ensure critical skills and capabilities are retained, modified, and devel- oped, as appropriate, in areas related to solid and liquid engines, large diameter fuel tanks, rocket propulsion, and other ground test capabilities for an effective transition to the follow- on Space Launch System. (4) The capacity for efficient and timely evolution, including the incorporation of new technologies, competition of sub-ele- ments, and commercial operations. SEC. 303. MULTI -PURPOSE CREW VEHICLE. (a) INITIATION OF DEVELOPMENT.— (1) IN GENERAL.—The Administrator shall continue the development of a multi-purpose crew vehicle to be available as soon as practicable, and no later than for use with the Space Launch System. The vehicle shall continue to advance development of the human safety features, designs, and systems in the Orion project. 42 USC 18323. Deadline.